![TankNet PL-1 Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/tanknet/pl-1/pl-1_user-manual_817702008.webp)
- 13 -
Brix Entry (“Br”)
The Brix entry screen allows Brix measurements taken at the
tank to be entered directly into the thermostat. In
TankNET
®
server environments, Brix measurements entered
at the thermostat are recorded into the TankNET
®
database
and are available in the form of fermentation graphs via the
Web.
Programming:
Valid range: -9.9 to 50.0
NULL value: -10.0 = “---”
1.
Press and release the SET button until the “BRIX”
annunciator flashes
2.
Use the UP / DOWN buttons to adjust the parameter to
the desired value
3.
Hold the SET button to exit programming mode OR press
and release the SET button again to advance to the next
programming parameter
- 14 -
Pump-over Entry (“Po”)
The Pump-over event entry screen allows cellar crews to
enter pump-over events at the thermostat. In TankNET
®
server environments, pump-overs are viewable on both the
winery maps and on the fermentation graphs via Web
Browser.
Programming:
1.
Press and release the SET button until the “Po”
parameter is displayed.
2.
Press the UP or DOWN button once to display the current
parameter value. With the current value displayed, use
the UP/DOWN buttons to adjust the parameter to the
desired value
3.
Hold the SET button to exit programming mode OR press
and release the SET button again to advance to the next
programming parameter
Note:
The pump-over entry feature is designed for minimal user
interaction. Cellar staff need not remember to change the pump-
over state from “On” to “OFF after completing a pump-over
operation. Instead, the thermostat will automatically change the
pump-over state from “On” to “OFF” as determined by the default
pump-over duration.
See Pump-over Duration (“Pod”) for more
information about this mechanism.