5
Instructions
• Qualified personnel must evaluate wall or
ceiling fastening. Mounting through the
(4) 1/2” ID holes on the base may vary
due to surface materials. A possible method
for concrete, brick and cement block is a
sleeve anchor type stud fastener (fig. 4)
instead of, sometimes difficult to in install,
long lag bolts.
SECONDARY SUPPORT
WARNING: A secondary support chain is required for all objects mount-
ed over head to protect personnel in case of failure in mounting hard-
ware or structure.
• (Fig. 5) Attach support cable/chain
to one of the slots in guide arm. Other
end of support cable to be attached to
a support other than the main one
supporting the hose reel.
• The safety chain/cable should allow
reel to drop no more than 6 to 12 in.
if primary connection is released.
Adjustment
RATCHET LOCK
CAUTION: To avoid damage to the reel or personnel, always hold on
to hose while it is rewinding. Hazards or unsafe practices which may
result in minor personal injury or product or property damage.
• Ratchet “clicks” four
times every half-spool
revolution.
• (Fig. 6) To latch reel,
slowly pull out hose and
allow it to retract after
clicks 1-4.
• (Fig. 7) To unlatch,
slowly pull out hose until
“clicking” stops, then let
hose rewind until hose
stop rests against guide.
• To disable ratchet, see
section in servicing on
“Ratchet Lock
Replacement/Removal”.
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Содержание equip 098-014508-45
Страница 2: ...2 Instructions 6 3 5 4 1 7 2 ...