Notes about Operation
28
Before Using
Connecting the AC Adaptor
When ready for actual operation, disconnect the USB cable from the
Base Unit and supply power by connecting to the supplied AC
adaptor.
When using RTR-500NW, please
connect the LAN cable to the
HUB before supplying power.
About the supplied AC adaptor (AD-06A1)
Input: AC100-240V
Output: DC6V 500mA
Frequency: 50/60Hz
Cable length: 1.8m
Plug Type:
LED Lamps before Starting Operation
At this point if the Unit is properly running, after having supplied power
all the LED lamps should come on and after a short time the POWER
and ACTIVE LED lamps should remain on.
- For details about the other LED lamps see page 30 of this Manual.
Содержание RTR-500
Страница 2: ......
Страница 17: ...Getting Ready This section explains what needs to be done before registrations and settings can be made ...
Страница 29: ...Notes about Operation This section explains a few items that should be remembered when carrying out operation ...
Страница 41: ......
Страница 42: ......
Страница 44: ......