![Takeuchi TB 250 Скачать руководство пользователя страница 91](http://html2.mh-extra.com/html/takeuchi/tb-250/tb-250_workshop-manual_3331249091.webp)
3-10
3
CONTROL VALVE
FUNCTION
When the Boom Lower operation is performed
When the Boom Lower operation is performed, the pilot
pressure is led to the port P1 to push down the spool (3).
This allows the oil in the spring chamber (5) to flow through
the passage (4) and into the port Dr (tank port). As a result,
the poppet (1) is kept opened and the return passage is
secured.
Switch valve
This valve switches among the circuits of bucket, arm,
boom, swing and service when any of them is activated
during traveling. The combined control of straight travel
and other operation can be done, because the oil supplied
by the pump P3 is directed to the section other than the
travel section.
When the switch valve is activated
When the traveling operation and other operation are per-
formed at the same time, the pilot pressure is directed tot
the port P1 to push up the spool (1). This allows the oil
entered the port P to flow through the parallel passage (2),
the spool head and the second parallel passages A and B.
Since the second parallel passage A is connected to the
boom and the bucket sections, while the second parallel
passage B is connected to the arm and the swing sections,
the combined operation of traveling and other operation
can be achieved.
When the switch valve is not activated
The spool (1) is not switched because the pilot passage
(2) is open to the tank passage and thus the pressure in
the pilot chamber (3) is equal to the pressure in the tank.
Thus, the oil entered the port P flows into the center bypass
passage (3). Also, part of the oil flows through the parallel
passage (2), dozer blade and slew sections.
��������
�
�
�
�
�
��
��
��������
��
�
�
�
� �
�
��������
��
�
�
�
�
�
Содержание TB 250
Страница 1: ......
Страница 3: ...1 1 SAFETY 1 Safety alert symbol 1 2 Safety precautions 1 3 Cautions when working 1 9...
Страница 36: ...2 24 2 TIGHTENING TORQUE SERVICE DATA...
Страница 37: ...2 25 2 SERVICE DATA HYDRAULIC CIRCUIT DIAGRAM HYDRAULIC CIRCUIT DIAGRAM Equipped with options 1 2...
Страница 38: ...2 26 2 HYDRAULIC CIRCUIT DIAGRAM SERVICE DATA Equipped with options 2 2...
Страница 39: ...2 27 2 HYDRAULIC CIRCUIT DIAGRAM SERVICE DATA Equipped with angle blade and blade oat 1 2...
Страница 40: ...2 28 2 HYDRAULIC CIRCUIT DIAGRAM SERVICE DATA Equipped with angle blade and blade oat 2 2...
Страница 41: ...2 29 2 HYDRAULIC CIRCUIT DIAGRAM SERVICE DATA Equipped with high ow option 1 2...
Страница 42: ...2 30 2 HYDRAULIC CIRCUIT DIAGRAM SERVICE DATA Equipped with high ow option 2 2...
Страница 43: ...2 31 2 HYDRAULIC CIRCUIT DIAGRAM SERVICE DATA Equipped with high ow angle blade blade oat option 1 2...
Страница 44: ...2 32 2 HYDRAULIC CIRCUIT DIAGRAM SERVICE DATA Equipped with high ow angle blade blade oat option 2 2...
Страница 46: ...2 34 2 ELECTRIC CIRCUIT DIAGRAM SERVICE DATA First auxiliary hydraulic piping with proportional control...
Страница 49: ......
Страница 59: ...2 46 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 60: ...2 47 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 61: ...2 48 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 62: ...2 49 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 63: ...2 50 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 64: ...2 51 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 65: ...2 52 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 66: ...2 53 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 67: ...2 54 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 68: ...2 55 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 69: ...2 56 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 70: ...2 57 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 71: ...2 58 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 72: ...2 59 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 73: ...2 60 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA NAME STANDARD NO...
Страница 74: ...2 61 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 75: ...2 62 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 76: ...2 63 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 77: ...2 64 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 78: ...2 65 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 79: ...2 66 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 80: ...2 67 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 81: ...2 68 2 WIRE HARNESS WIRING DIAGRAM SERVICE DATA...
Страница 92: ...3 11 3 CONTROL VALVE FUNCTION...
Страница 108: ...4 3 4 SERVICE STANDARDS DISASSEMBLY AND ASSEMBLY Clearance for pin and bushing...
Страница 130: ...4 25 4 UPPER FRAME DISASSEMBLY AND ASSEMBLY 15 Side frame R 16 Side frame L 17 Tool box 18 Cover 19 Bracket 20 Cover 2 2...
Страница 165: ...4 60 4 HYDRAULIC PUMP DISASSEMBLY AND ASSEMBLY f Remove the plug g Remove the spring and the ball...
Страница 267: ...4 162 4 SLEW MOTOR DISASSEMBLY AND ASSEMBLY Special tools Oil seal press tting jig A Collar installation jig B...
Страница 352: ...ENGINE 6 Machine model Mounted engine TB250 4TNV88...