4-4
Assembling of cap frame unit
3.
Wind the wire (6) to the drive ring (7) by one turn.
4.
After reversing the drive wire (6) by the wire guide ring (8), tighten the end part (9) using the screw (10) temporarily.
Put the drive wire (6) on the left side in the rear groove (A) of the wire guide ring (8), and put the drive wire (6) on the right side in the
front groove (B) of the wire guide ring (8).
At the bottom part (C), switch the groove for putting the drive wire (6).
The number of washers is different in right side and left side.
The direction of the end part (9) is different in right side and left side.
2.
Adjustment of tension of drive wire
Proceed to the following works.
6
7
9
6
10
10
8
8
6
9
A
B
C
6
KY01
Содержание TEJT II -C
Страница 2: ......
Страница 26: ...1 22 Changing procedure of the frame ...
Страница 27: ...2 Set the frame 1 Cap frame p 2 2 2 Tubular goods frame p 2 5 ...
Страница 32: ...2 6 Set the frame ...