1-8
Changing procedure of the frame
3.
Attaching of tubular goods frame sash
1.
Fix the tubular goods frame sash (1) using the attaching screw (2).
Proceed to the next work.
1
2
1
2
Turn ON the power switch, or release sleep mode (p.1-19) and after
KY01
Содержание TEJT II -C
Страница 2: ......
Страница 26: ...1 22 Changing procedure of the frame ...
Страница 27: ...2 Set the frame 1 Cap frame p 2 2 2 Tubular goods frame p 2 5 ...
Страница 32: ...2 6 Set the frame ...