TB7300 Installation and Operation Manual
Installation
63
© Tait Limited November 2016
5.6.2
Connecting DC Power
The base station is designed to accept a nominal 13.8V DC, with negative
ground.
Notice
Any mains power supply used to power the base station is
required to meet the isolation separation for reinforced insulation of
3000Vrms or 4242VDC.
The DC power connector at the rear of the base station is a heavy-duty M4
screw terminal connector suitable for many forms of connection.
You must connect the DC supply from the battery to the base station via a
readily accessible disconnect device such as a fuse or DC-rated circuit
breaker with the appropriate rating, as shown in the table below.
The DC input leads should be of a suitable gauge to ensure less than 0.2V
drop at maximum load over the required length of lead. Use only flexible
copper cables.
Terminate the DC input leads with a suitable crimp connector for attaching
to the M4 screws of the DC power connector.
Pin
Signal Name
Signal Type
Notes
1
13.8VDC
input
2
ground
input
2
1
external view
Nominal
Supply Voltage
Input Voltage
Range
Circuit Breaker/
Fuse Rating
Recommended
Wire Gauge
a
a. For a length of 1.5m to 2m (5ft to 6.5ft) (typical).
13.8VDC
11VDC to 14.4VDC 20A
12AWG / 3.3mm
2
Содержание TB7300
Страница 1: ...TB7300 Base Station Installation and Operation Manual MBD 00001 04 Issue 4 November 2016...
Страница 2: ...2 TB7300 Installation and Operation Manual Tait Limited November 2016...
Страница 6: ...TB7300 Installation and Operation Manual 6 Tait Limited November 2016...
Страница 10: ...10 Preface TB7300 Installation and Operation Manual Tait Limited November 2016...
Страница 28: ...28 Operation TB7300 Installation and Operation Manual Tait Limited November 2016...
Страница 46: ...46 Working with Base Stations from Your PC TB7300 Installation and Operation Manual Tait Limited November 2016...
Страница 68: ...68 Installation TB7300 Installation and Operation Manual Tait Limited November 2016...
Страница 70: ...70 Maintenance TB7300 Installation and Operation Manual Tait Limited November 2016...
Страница 72: ...72 Troubleshooting TB7300 Installation and Operation Manual Tait Limited November 2016...
Страница 74: ...74 Appendix A Interface Pin Allocations TB7300 Installation and Operation Manual Tait Limited November 2016...
Страница 84: ...84 Glossary TB7300 Installation and Operation Manual Tait Limited November 2016...