16
Description
TB7300 Installation and Operation Manual
© Tait Limited
November 2016
1.5
Theory of Operation
The RF input is fed directly to the receiver board, while the RF output is
via the exciter and PA boards. The control board also receives signals from,
and sends signals to, the system interface, the Ethernet interface, and the
front interface (see
Figure 1.1
).
The Ethernet interface carries voice over IP and also allows maintainer
access via a web browser.
The control board carries out signal processing and has overall control of
the base station.
The control board converts information between analog and digital and
controls the maintainer’s access via the Ethernet interface. It performs the
air interface signal processing for digital DMR operation, gives the base
station an identity as a network element, and provides the physical
connections for the Ethernet and system interfaces.
Figure 1.1
Base station high-level diagram
RF Input
RF Output
Receiver
Board
PA
Board
Supply
Interface
Board
Exciter
Board
Front
Interface
Control
Board
System Input
and Output
Ethernet Interface
to Network
Содержание TB7300
Страница 1: ...TB7300 Base Station Installation and Operation Manual MBD 00001 04 Issue 4 November 2016...
Страница 2: ...2 TB7300 Installation and Operation Manual Tait Limited November 2016...
Страница 6: ...TB7300 Installation and Operation Manual 6 Tait Limited November 2016...
Страница 10: ...10 Preface TB7300 Installation and Operation Manual Tait Limited November 2016...
Страница 28: ...28 Operation TB7300 Installation and Operation Manual Tait Limited November 2016...
Страница 46: ...46 Working with Base Stations from Your PC TB7300 Installation and Operation Manual Tait Limited November 2016...
Страница 68: ...68 Installation TB7300 Installation and Operation Manual Tait Limited November 2016...
Страница 70: ...70 Maintenance TB7300 Installation and Operation Manual Tait Limited November 2016...
Страница 72: ...72 Troubleshooting TB7300 Installation and Operation Manual Tait Limited November 2016...
Страница 74: ...74 Appendix A Interface Pin Allocations TB7300 Installation and Operation Manual Tait Limited November 2016...
Страница 84: ...84 Glossary TB7300 Installation and Operation Manual Tait Limited November 2016...