54
Replacing Modules
TB7100 Installation and Operation Manual
© Tait Electronics Limited
December 2005
5.1
Removing the Base Station and Opening the Tray
Important
The modules in the base station are not hot-pluggable. It is
recommended the tray is removed from the rack before any
modules are replaced.
1.
If an internal AC Power supply is fitted, disconnect the base station
from AC power
g
.
2.
Remove the fuse
e
at the rear of the base station to disconnect the
base station from DC power.
3.
Use a Philips #2 screwdriver to disconnect the cables from the DC
power connector
f
.
4.
Disconnect the antenna connectors for transmit and receive
d
.
5.
Disconnect any other connectors.
6.
Disconnect the ground cable from the ground point
c
.
7.
Use a PZ2 Pozidriv screwdriver to remove the four M6 screws, and
remove the base station from the rack.
8.
Use a Torx T10 screwdriver to remove the 15 countersunk screws.
Remove the tray cover
b
.
Figure 5.1
Opening the tray
b
e
f
d
c
Configuration with internal AC power supply unit shown
g
Содержание TB7100
Страница 1: ...TB7100 base station Installation and Operation Manual MBB 00001 02 Issue 2 December 2005...
Страница 10: ...10 TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Страница 76: ...76 Connections TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Страница 126: ...126 Preparation for Operation TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Страница 128: ...128 Maintenance Guide TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Страница 142: ...142 TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...