TB7100 Installation and Operation Manual
Installation
51
© Tait Electronics Limited
December 2005
4.8.5
Mounting the Base Station
1.
Fit the base station into the cabinet or rack and secure it firmly with
an M6 (or 0.25 in if you are using imperial fittings) screw, flat and
spring washer in each of the four main mounting holes
b
, as shown
in
Figure 4.4 on page 51
.
2.
The base station can be wall-mounted by rotating the front mounting
brackets and fitting the optional rear brackets (TBBA03-01). When
the base station is wall-mounted ensure the airflow is from bottom to
top (front panel mounted down) or side to side.
3.
For transport or in installations subject to vibration, the base station
should be supported at the rear using a transit bracket
(Tait recommends to use the TB7100 transit bracket, Tait part
number 302-05282-00).
Figure 4.4
Base station mounting points (configuration with AC power supply unit shown)
b
main mounting holes
e
DC power connector
c
base station
f
AC power connector
d
ground point
G
rack frame
G
E
c
b
f
D
Содержание TB7100
Страница 1: ...TB7100 base station Installation and Operation Manual MBB 00001 02 Issue 2 December 2005...
Страница 10: ...10 TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Страница 76: ...76 Connections TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Страница 126: ...126 Preparation for Operation TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Страница 128: ...128 Maintenance Guide TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Страница 142: ...142 TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...