![Tait TB7100 Скачать руководство пользователя страница 49](http://html2.mh-extra.com/html/tait/tb7100/tb7100_installation-and-operation-manual_3295622049.webp)
TB7100 Installation and Operation Manual
Installation
49
© Tait Electronics Limited
December 2005
4.8
Installing the Base Station
4.8.1
Unpacking the Equipment
Unpacking the
Base Station
The base station is packed in a strong corrugated cardboard carton with top
and bottom foam cushions.
1.
Cut the tape securing the flaps at the top of the carton and fold them
flat against the sides.
2.
Rotate the carton carefully onto its side and then onto its top,
ensuring that none of the flaps is trapped underneath.
3.
Slide the carton upwards over the foam cushions and lift it away.
Remove the cushion from the bottom of the base station.
4.
Lift the base station clear of the remaining cushion.
Disposal of
Packaging
If you do not need to keep the packaging, we recommend that you recycle
it according to your local recycling methods. The foam cushions are CFC-
and HCFC-free and may be burnt in a suitable waste-to-energy combustion
facility, or compacted in landfill.
4.8.2
Identifying the Mechanical Configuration
The base station is available in two different mechanical configurations—
with or without provision for an internal AC power supply unit.
The mechanical configuration with provision for an internal AC power
supply has the following distinguishing features:
■
larger air intake on the right-hand side of the front panel
■
provision for AC connector on the left-hand side of the rear panel (refer
to
Figure 6.2 on page 66
)
■
ground point on the right-hand side of the rear panel rather than on the
left-hand side
■
different SI board and internal cables.
Содержание TB7100
Страница 1: ...TB7100 base station Installation and Operation Manual MBB 00001 02 Issue 2 December 2005...
Страница 10: ...10 TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Страница 76: ...76 Connections TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Страница 126: ...126 Preparation for Operation TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Страница 128: ...128 Maintenance Guide TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...
Страница 142: ...142 TB7100 Installation and Operation Manual Tait Electronics Limited December 2005...