Personnel:
n
Heating and sanitary technician
Protective equipment:
n
Protective gloves
n
Safety shoes
Transport the package to the installation location.
4.3
Unpacking the fresh water station
Personnel:
n
Heating and sanitary technician
Prerequisite:
n
The fresh hot water station is at the installation location.
1.
Lift the fresh hot water station out of the packaging with a
second person helping you.
2.
Keep the packaging for any further transport of the fresh hot
water station.
4.4
Storing the fresh water station
If the fresh water station is placed in storage prior to
installation, observe the following conditions:
–
Store the fresh water station in the original
packaging.
–
Store the fresh water station in a dry, dust-free
and frost-free room.
Transporting the fresh hot water sta-
tion
TACOTHERM FRESH PETA 2 / PETA 2 X
Transport and storage
V02.2020 11/2020
Item no. 215747
EA no. 1329
Operating instructions
31