Personnel:
n
Heating and sanitary technician
Protective equipment:
n
Protective goggles
Tool:
n
Spirit level
Material:
n
Means of bolting
1.
The fresh hot water station must be lifted to the installation
location by two persons.
2.
Hold the fresh hot water station in position at the installation
location and use a spirit level to ensure that the fresh hot water
station is aligned horizontally and vertically.
3.
Mark the position on the wall.
Fig.
21:
Gauge for holes
1 515
mm
2 470
mm
4.
5.
CAUTION!
Danger of injury due to airborne swarf or dust!
Choose the drill and type of bolt in accordance
with the wall material.
Use the spacer plates provided between the
wall and fresh hot water station.
Wear protective goggles and bolt the fresh hot water station to
the wall.
Bolting the fresh hot water station in
place
TACOTHERM FRESH PETA 2 / PETA 2 X
Assembly and installation
V02.2020 11/2020
Item no. 215747
EA no. 1329
Operating instructions
33