![Systems Trading Corporation Easy2Build Скачать руководство пользователя страница 50](http://html1.mh-extra.com/html/systems-trading-corporation/easy2build/easy2build_assembly-instructions-manual_1423553050.webp)
10.9A
Stand on a small step ladder inside the greenhouse. Install second roof vent to the left
side of the greenhouse. Slide profile L11A into profile L08B from the back of the
greenhouse towards the front.
Continue to slide vent past the end of
profile L08B until the hole in the other
end is visible. Screw S24A into hole
in L08A and slide vent back until
it rests next to the screw.
Y24
L11A
L08B
L05D
10.9B
QTY
#S24A
1
Screw
S24A
L08B
48 of 56
www.stcny.com
Use the hairpin clips connected to L05D
to secure the handle and prevent the vent
from opening and closing in high winds.
10.10A
From the inside of the greenhouse open arms of auto vent slightly. Line up window
bracket on arm B to holes in vent profile L10A and attach with two S41A screws.
Slide bolts in channel of profile L05G until they fit into holes on end of arm A. Secure
with two S14 hex nuts.
10.10B
QTY
#S41A
#S14
2
2
Nut / Screw
NOTE: ALL VIEWS ARE FROM INSIDE.
L05G
S14
10.9C
L10A
arm B
L05G
L10A
S41A
L05G
arm A
S25
L05D
Содержание Easy2Build
Страница 2: ......
Страница 59: ...Notes...