Systems Trading Corporation Easy2Build Скачать руководство пользователя страница 32

Line up the four profiles L03B so the holes are at the same position. 
Slide long side of connectors S20 and S08 into channel of profile, 
lining up holes as shown.

S20

S08

L03B

4.8A

Secure with three S02 screws. Repeat to make four sets.

4.8B

L03B

S02

S02

Place profiles L03B and L03V onto profiles L07C and L01D. Line up holes as shown.

Secure with six S02 screws. Repeat to make two sets.

4.9B

4.9A

QTY

Screw

#S02

12

QTY

Profile

#L07C 2

2

QTY

Profile

#L01D

QTY

8
4

#S02
#S08

Connector

QTY

4

4

#S02
#S20

QTY

4

#L03B

Profile

Connector

NOTE: ALL VIEWS ARE FROM INSIDE.

30 of 56 

www.stcny.com

L03B

L07C

L03V

L07C

L01D

L03B

L03V

L07C

L07C

L01D

L03B

L03V

L01D

S02

Содержание Easy2Build

Страница 1: ...utions 7 S tr ucture 10 8 x 12 Easy Grow Greenhouse Assembly Instructions Systems Trading Corporation 450 7th Avenue Suite 2809 New York NY 10123 Customer Service 877 407 9100 ext 1 Email customerserv...

Страница 2: ......

Страница 3: ...vent to ensure proper ventilation We have also included an automatic vent opener to help you maintain optimal temperature effortlessly When properly assembled and maintained this greenhouse will prov...

Страница 4: ...parts Do not lean against or push the greenhouse during assembly Take special care not to touch overhead power lines with the aluminium profiles Do not attempt to assemble the greenhouse in windy or w...

Страница 5: ...2 Step 10 L12B 4 Step 10 L06J 1 Step 3 L07C 2 Step 4 L07D 2 Step 4 Step 3 Profile QTY L13B 2 1 1 1 1 1 1 Step 2 Step 2 Step 2 Step 2 Step 2 Step 2 Step 2 L13C L13D L13E L13G L13H L13F L05A L05C L05D L...

Страница 6: ...tep 4 S39 1 Step 8 S21 1 10 Steps 2 3 Step 3 1 Step 1 S28 S18 S12 Panel QTY 2 Step 1 2 Step 1 Y1 2 Step 3 Y19 2 Step 2 Y25 2 Step 2 Y26 Y16 2 Step 1 Y17 1 Step 3 Y5 1 Step 3 Y6 1 Step 3 Y20 2 Step 1 Y...

Страница 7: ...Step 2 Step 2 Door Lock QTY 1 S41 Step 10 2 S41A Step 10 Auto Vent Opener QTY 10 10 S34 S35 Step 16 Step 16 Anchor Clip and Peg QTY Connector QTY 22 11 3 Steps 2 4 Steps 1 3 Step 1 1 1 Step 3 Step 3...

Страница 8: ...with hole in each profile 28 711 mm L03C L03D S01 S02 S02 Place all the parts for the back face on a level surface Make sure the pieces are in the correct positions before assembling Carefully follow...

Страница 9: ...liding the long sides of connector S01 into channels lining up last hole in S01 with holes in profile L04F Attach profiles L03D and L02A to profile L04F by sliding the long side of connector S01 into...

Страница 10: ...rs S08 into channels of profiles L03C L03D and L03K 1 4A 1 5A Secure with four S02 screws 1 4B Secure each connector with two S02 screws 1 5B QTY 6 3 S02 S08 Connector L03L L16 S08 S02 NOTE ALL VIEWS...

Страница 11: ...tors into profiles Line up parts first to ensure correct placement Slide connectors until they CLICK securely into profile Use WD40 or liquid soap if pieces do not easily slide together Wear gloves L1...

Страница 12: ...channels of profiles L05A and L05H as shown Screw hex nut S14 onto bolt Do not completely tighten 1 7B 1 8B QTY QTY 2 2 L05A L05H Profile Nut Bolt 6 6 S13 S14 L05A L05A L05H S13 S14 NOTE ALL VIEWS AR...

Страница 13: ...and Y18 into V channels on profiles L02A L02B L03C L03D and L03L Fit inside channels on profiles L05A and L05H Remove protective plastic from EACH side of poly carbonate panels before installing Disp...

Страница 14: ...ensure correct placement Slide connectors until they CLICK securely into profile Use WD40 or liquid soap if pieces do not easily slide together Wear gloves NOTE ALL VIEWS ARE FROM INSIDE Slide profile...

Страница 15: ...Slide connectors until they CLICK securely into profile Use WD40 or liquid soap if pieces do not easily slide together Wear gloves NOTE ALL VIEWS ARE FROM INSIDE Slide connectors S09 and S10 half way...

Страница 16: ...ght Use hex key to securely tighten and hold in place Repeat step 1 13 inserting cable connectors S06 into profiles L02A and L01J Cable rests next to panel Y1 under profile L04F Slide connector until...

Страница 17: ...m both sides of panels Y25 Place side to face toward the sun facing down Fit panels into channels of profile L05I L05I 15 of 56 www stcny com Remove protective plastic from EACH side of poly carbonate...

Страница 18: ...up the holes on each end with the holes in profiles L13E and L13B Slide hex bolt so it fits through hole in brace Secure brace with two S02 screws and S14 hex nut NOTE The hole for hex bolt is not at...

Страница 19: ...L13C L13C S33 2 7A 2 8A Slide two hex bolts S13 into channel of profile L05F Screw two S14 hex nuts onto bolt on each end Do not completely tighten 2 7B L05F S13 S14 L05F Remove protective plastic fro...

Страница 20: ...on profiles L13D and L13G as shown Center the levers so the screw holes are visible L13H L13F L13G L13D S40 L13G S40 L13D 2 9B Move lever to the right side to place lock in the unlocked position 2 9C...

Страница 21: ...e face to the ground ALL VIEWS ARE SHOWN FROM INSIDE Place all the parts for the front face on a level surface Make sure the pieces are in the correct positions before assembling Carefully follow the...

Страница 22: ...sides of connectors S01 into channels of profile L04A lining up last hole in S01 with holes in profile L04A Attach profiles L06A and L02A to profile L04A Slides long side of connectors S01 into chann...

Страница 23: ...is only one way to properly fasten connectors into profiles Line up parts first to ensure correct placement Slide connectors until they CLICK securely into profile Use WD40 or liquid soap if pieces d...

Страница 24: ...S17L and S17R rest in channels of L02L and L02K Connectors S09 and S10 click securely into profiles S10 L02A S09 L02B ALL VIEWS FROM INSIDE Connectors S09 and S10 CLICK into place There is only one w...

Страница 25: ...L02B L06A and L06B Fit inside channels on L05C profiles Remove protective plastic from EACH side of poly carbonate panels before installing Dispose of plastic properly Install with side labeled Face t...

Страница 26: ...oles on connector L16 with holes on profiles L01L and L01K Secure with four S02 screws Secure with two S02 screws 3 7D Secure with two S02 screws 3 7B 3 7C 3 8B NOTE ALL VIEWS ARE FROM INSIDE L16 L01K...

Страница 27: ...o V channels Snap connectors S04 and S05 securely into profiles QTY 2 S02 Screw There is only one way to properly fasten connectors into profiles Line up parts first to ensure correct placement Slide...

Страница 28: ...tight Use hex key to securely tighten and hold in place Repeat step 3 10 inserting cable connectors S06 into profiles L02A and L01L Cable rests next to panel Y5 under profile L04A Slide connector unt...

Страница 29: ...bottom on profile L03V QTY 8 8 S01 S02 QTY 4 L03V Profile Connector 4 1B Slide another connector S01 so it lines up with the middle hole on profile L03V 4 1C Secure all pieces with S02 screws Repeat t...

Страница 30: ...TANT Connector S03 rests on top of connector S01 S02 screw secures S03 to profile L04B QTY QTY 4 L04C Profile Screw 8 S02 QTY 4 S39 Connector 4 5A 4 3 4 4 Connector S39 CLICKS into place Connector S03...

Страница 31: ...asten connectors into profiles Line up parts first to ensure correct placement Slide connectors until they CLICK securely into profile Use WD40 or liquid soap if pieces do not easily slide together We...

Страница 32: ...e four sets 4 8B L03B S02 S02 Place profiles L03B and L03V onto profiles L07C and L01D Line up holes as shown Secure with six S02 screws Repeat to make two sets 4 9B 4 9A QTY Screw S02 12 QTY Profile...

Страница 33: ...Y Profile L07D 2 2 QTY Profile L01D L03T S03 L03T S19 Slide connectors S19 and S03 into profile L03T until they click securely into place Repeat to make two sets 4 11 L03T S19 S03 QTY 2 S03 QTY 2 S19...

Страница 34: ...D L01D NOTE ALL VIEWS ARE FROM INSIDE Connectors S03 S19 and S39 CLICK into place There is only one way to properly fasten connectors into profiles Line up parts first to ensure correct placement Slid...

Страница 35: ...QTY Profile 2 2 2 2 QTY Profile S37 S02 5 1A 5 1B Place all the parts for the shelves on a level surface Make sure the pieces are in the correct positions before assembling Carefully follow the order...

Страница 36: ...ainst the wall Stand each side up and place next to the back Both sides are identical until the shelf profiles are connected Make certain that positions of profiles L07A and L07B match the diagrams be...

Страница 37: ...connectors click into place L14C L14A L07D S03 S39 6 2A 6 2B S10 L07D S05 L01C Connector S05 CLICKS into place Connector S10 CLICKS into place There is only one way to properly fasten connectors into...

Страница 38: ...inish this step This will make it easier to keep the angles square 7 1 Connectors S03 CLICK into place Connectors S03 CLICK into place There is only one way to properly fasten connectors into profiles...

Страница 39: ...L04A Push front into sides until connectors click into place L07C S09 L04A S37 L01D S04 There is only one way to properly fasten connectors into profiles Line up parts first to ensure correct placemen...

Страница 40: ...of profile L04A Secure S37 connectors to L04A profiles with four S02 screws 7 3B QTY 4 S02 Screw L04A L14A L14C L14B L04A L14D S39 L14C S39 L14D Connector S39 CLICKS into place Connector S39 CLICKS i...

Страница 41: ...S22 S02 IMPORTNT U shaped cutout is not at midpoint of profiles L03R and L03S Attach shorter side 26 5 to connector S22 QTY QTY Connector 16 4 S02 S22 1 2 L03S L03U Profile QTY 4 1 L03M L03R Profile...

Страница 42: ...L03S and L03U 8 4 L03Q L03R IMPORTANT U shaped cutouts on profiles L03R and L03S face the FRONT IMPORTANT U shaped cutouts on profiles L03N and L03Q face the BACK S20 L03S S20 L03R There is only one...

Страница 43: ...correct positions before installing Arrange profile L02H so rectangular holes in channels face the LEFT when looking at the front of the greenhouse from the outside IMPORTANT Arrange profile L02H so r...

Страница 44: ...in profiles L03V and L03U L03T and L03Q L03T and L03N L03V and L03R and L03V and L03S with holes in S23 bracing bar From inside of greenhouse line up bracing bar S23 with holes in gable profiles L03U...

Страница 45: ...Please carefully follow the order of assembly to ensure an easy installation Wear proper safety gear including shoes gloves and goggles Attach one side of long cable S07 to hook and lace behind profi...

Страница 46: ...rs S06 into profile L07D with hook facing the front and into profile L01D with hook facing the back Cable rests behind profile L14A Slide connector until profile corners are square and cable is tight...

Страница 47: ...0 The auto vent opener is packed separately Remove protective plastic from both sides of panels Y24 Place side to face toward the sun facing down Fit panels into channels of profiles L10A and L11A L11...

Страница 48: ...file L05G Screw two S14 hex nuts onto bolts on ends of each profile Do not completely tighten S13 S14 S13 S14 4 6 QTY 1 1 Bolt Nut QTY Profile L05G L05D QTY Profile L05G L05D L05G L05D L03Q L03R L03N...

Страница 49: ...rew S24A into hole in L08A and slide vent back until it rests next to the screw IMPORTANT The handle of roof vent is on the inside of the greenhouse L11A L08A Y24 S24A L08A L05D 10 8B QTY S24A 1 Screw...

Страница 50: ...L08B L05D 10 9B QTY S24A 1 Screw S24A L08B 48 of 56 www stcny com Use the hairpin clips connected to L05D to secure the handle and prevent the vent from opening and closing in high winds 10 10A From t...

Страница 51: ...ace From the inside of the greenhouse slide circular vent under the cable Line up pins in vent frame with holes in circular vent and slide into place 11 1B From the inside secure the vent with four pl...

Страница 52: ...els in base profiles L01D Remove protective plastic from both sides of panels Y21 Y22 and Y23 Place side to face toward the sun facing out when installing Slide panels carefully into V channels in gab...

Страница 53: ...th with scissors Make sure to insert stripping as shown securely into the V channels of all the profiles cutting each piece to the proper length This will help protect the inside of your greenhouse fr...

Страница 54: ...plate L09D to profile L07D in the back 14 2A 14 2B Place trim plates L09C and L09D onto profiles L07C and L07D on outside of greenhouse Trim plates fit over edges of side and roof panels and bolts ar...

Страница 55: ...ck of the greenhouse slide plastic trim plates J02L J02R and J03 into connectors S09 S10 and S12 until they snap into place IMPORTANT The plastic trim plates J02L J02R J03 and J06 fit into connectors...

Страница 56: ...hem IMPORTANT The rubber stripping J01C is cut to length with scissors Make sure to insert stripping as shown securely into the V channels of all the profiles cutting each piece to the proper length T...

Страница 57: ...hammer to drive the pegs all the way into the concrete and let dry completely for twenty four hours QTY S35 Anchor Peg QTY S34 10 10 Anchor Clip IMPORTANT The greenhouse must be firmly secured to the...

Страница 58: ...ce all the parts for the trays and bin holder on a level surface Make sure the pieces are in the correct positions before assembling Carefully follow the order of assembly to ensure an easy installati...

Страница 59: ...Notes...

Страница 60: ...on If you need any help or have missing or damaged parts please contact us Please keep this manual in a safe place for reference Copyright 2008 Systems Trading Company All rights reserved 450 7th Aven...

Отзывы: