![Systems Trading Corporation Easy2Build Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/systems-trading-corporation/easy2build/easy2build_assembly-instructions-manual_1423553003.webp)
Introduction
Before Starting Assembly:
5. Make sure you have the proper tools:
After choosing a location, proper preparation of the site is essential. The site must be level. If the site is
not level, create a base slightly larger than the outside dimensions of the greenhouse using a perimeter
of two by fours filled with either soil, sod or gravel. Make sure the base is square by measuring the
diagonals from both sides and making sure they are equal. The greenhouse is secured from the inside
with pegs into holes cast with concrete. See step16 for details.
If you decide to have a concrete base, it is best to contact a reliable contractor to ensure it is flat and
level.Make sure you have checked with your local authorities regarding any required building permits.
When selecting a site for your greenhouse, a flat level area is essential and if possible, with proper
water drainage and easy access to power and water necessary for greenhouse gardening.
Choose a sunny, level position away from overhanging trees and power lines and protected from the
wind as much as possible. The location should be away from structures that could cause snow to drift
on or around the greenhouse.
Locate underground pipes or cables before preparing the site or anchoring the greenhouse.
Note: You may assemble the greenhouse on a hard level surface and move it to its final position when
finished. Make sure there are no obstacles between the assembly area and the final position.
Thank you for purchasing your Easy2Build
TM
8x12 Easy-Grow Greenhouse. This model features two roof
vents and a circular air vent to ensure proper ventilation. We have also included an automatic vent opener
to help you maintain optimal temperature effortlessly. When properly assembled and maintained, this
greenhouse will provide years of enjoyment.
The List of Parts has the corresponding step number referenced to each part. We recommend that
while you go through the list, make staging areas for each step and place the parts necessary fo
step in these areas. This will save you time and effort during assembly.
2. Lay the parts out in separate staging areas:
3. Select a Location:
4. Prepare a Foundation:
1. Make sure you have all the necessary parts:
Compare the contents of the two cartons to the List of Parts. If any parts are missing or damaged or
you have any questions, please contact Customer Service by phone at (877) 407-9100 ext. 1 or by email
at [email protected]
before beginning assembly.
CAREFULLY READ ALL INSTRUCTIONS BEFORE YOU BEGIN AND FOLLOW THE STEPS IN
THE ORDER THEY ARE PRESENTED.
NOTE: A cordless drill with Phillips head bit is highly recommended but not essential.
Tape Measure
Work Gloves
Safety Goggles
Phillips Screwdriver
Spirit Level
Small Step Ladder
Wooden Mallet
Liquid Soap or WD40 Lubricant
Scissors
Hex Key (included)
•
•
•
•
•
•
•
•
•
•
1 of 56
www.stcny.com
This greenhouse has been designed with patented technology to be easily assembled. All but one step
can be completed by one person. You will require assistance from another person to attach the roof.
Although the greenhouse can be assembled in six to eight hours, we recommend that you take your time
and make it aweekend project.
These instructions include helpful hints and important information needed to safely assemble and
properly maintain the greenhouse. Please carefully read these instructions completely before you begin.
Содержание Easy2Build
Страница 2: ......
Страница 59: ...Notes...