![Systems Trading Corporation Easy2Build Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/systems-trading-corporation/easy2build/easy2build_assembly-instructions-manual_1423553021.webp)
Assemble Front
Lay out profiles L02A, L02B, L06A and L06B so all holes line up.
Slide short side of connector S01 into channels of profiles L02A,
L02B, L06A and L06K.
Line up lower hole on connector S01 with hole in each
profile and secure with S02 screws.
28”
(711 mm)
L06K
L06A
28”
(711 mm)
L02B
L02A
L06A
L06K
L02B
L02A
L06A
S01
L02B
S01
L02A
S01
L06K
S01
!
The front is assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
!
Place all the parts for the front face on a level surface.
Make sure the pieces are in the correct positions before assembling.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
IMPORTANT: The holes are not at the midpoint of the profile.
Arrange profile so the 28” portion will be the bottom when standing.
3.1A
3.1B
NOTE: ALL VIEWS ARE FROM INSIDE.
S02
QTY
4
4
#S01
#S02
QTY
1
1
1
1
#L06A
#L06K
Profile
Connector
QTY
Profile
#L02A
#L02B
19 of 56
www.stcny.com
Содержание Easy2Build
Страница 2: ......
Страница 59: ...Notes...