22
OPENING OF ACCESS PANELS
All access panels are removable by unscrewing the self tapping retaining screws.
COILS
The refrigeration system is hermetically sealed and should require no regular maintenance. However, it is
recommended to leak test the refrigerant system and check the general operating conditions and control devices
on a regular basis. The operating pressures should be checked particularly as they are an excellent guide for
maintenance. After any intervention requiring the opening of the refrigerant circuit, the system must be completely
vacuum drained by using the 3 take-offs (VP) installed for this purpose (VP) (Refer to the appended refrigerant
circuit diagram).
Clean the heat exchanger using a special product for aluminium-copper heat exchangers, and rinse with water.
Do not use hot water or steam, as this could cause the pressure of the
refrigerant to rise.
Check that the surface of the aluminium fins of the heat exchanger is not
damaged by impacts or scratches, and clean with an appropriate tool if
necessary.
The air filter located on the air intake must be cleaned or replaced at regular
intervals to ensure that unit operate properly,.
A clogged filter causes a reduction in the airflow across the heat exchanger
and this reduces the performance output.
The G4 high efficiency filters located on slide rails upstream of the evaporator
enable the filters to be removed from the outside of the unit housing.
IT IS RECOMMENDED THAT THE DISCONNECT SWITCH BE PADLOCKED
CAUTION
BEFORE CARRYING OUT ANY OPERATION ON THE EQUIPMENT, CHECK
THAT THE ELECTRICAL POWER SUPPLY IS SWITCHED OFF AND THAT IT
CANNOT BE SWITCHED ON INADVERTENTLY.
ELECTRICAL SECTION
Check that the main power supply cable is not damaged or altered in such a way as to affect the insulation
Check that the interconnecting cables between the two units are not damaged or altered, and that they are correctly
connected.
The contact surfaces of relays and contactors should be inspected regularly by an electrician and replaced as
judged necessary. On these occasions the control box should be blown out with compressed air to remove any
gathwing of dust.
Check the earth grounding connection.
BLOWER DRIVE SYSTEM
blower shaft and motor bearings are of permanently lubricated, sealed type and require no regular maintenance
other than a check on their general condition. The blower belt tension should be checked regularly and belt surfaces
inspected for cracks or excessive wear.
Содержание Rooft@ir 100
Страница 2: ......
Страница 28: ......
Страница 29: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO ...
Страница 33: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO V RT100 RT110 2308 3400 3326 1777 1813 3328 2200 900 651 50 170 ...
Страница 34: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO VI 532 A B EXHAUST BLOWER 40 50 60 70 80 100 110 A 642 690 B 828 910 ...
Страница 37: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO IX AIR FLOW AIR RETURN 445 178 50 D A C 130 50 397 B 260 RT40 RT50 ...
Страница 50: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XXII RT40 RT50 CONTROL pCO1 1 3 1 4 1 3 1 4 ...
Страница 51: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XXIII POWER AS L1 A1 A3 L2 L3 T1 T2 T3 ...
Страница 52: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XXIV 5 0 ...
Страница 53: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XXV RT60 RT70 RT80 CONTROL pCO1 ...
Страница 54: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XXVI RT100 RT110 CONTROL pCO1 ...
Страница 55: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XXVII POWER AS L1 A1 A3 L2 L3 T1 T2 T3 RT60 RT70 RT80 RT100 RT110 ...
Страница 56: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XXVIII 5 0 5 0 ...
Страница 57: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XXIX ...
Страница 58: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XXX ...
Страница 64: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XXXVI ...