5
INSPECTION AND STORAGE
At the time of receiving the equipment carefully cross check all the elements against the shipping documents in
order to ensure that all the crates and boxes have been received. Confirmation of the type of unit ordered can be
obtained by reading the maker’s plate (capacity, type and air blowing configuration).
Inspect the units for any visible or hidden damage.
In the event of shipping damage, write precise details of the damage on the shipper’s delivery note
and send immediately a registered letter to the shipper within 48 hours, clearly stating the damage
caused. Forward a copy of this letter to the manufacturer or their representative.
Never store or transport the unit upside down. Protect unit at the job side from domages made by others. When
unit is stored on the ground, avoid mud store unit leveled.
CONTENTS OF PACKAGE
1 Rooft@ir
1 Installation and maintenance manual
1 Control manual
WARRANTY
The appliances are delivered fully assembled, factory tested and ready to operate.
Any modification to the units without the manufacturer’s prior approval, shall automatically render the warranty
null and void.
The following conditions must be respected in order to maintain the validity of the warranty:
Commissioning shall be performed by specialised technicians from technical services approved by
¢
the manufacturer.
Maintenance shall be performed by technicians trained for this purpose.
¢
Only Original Equipment spare parts shall be used.
¢
All the operations listed in the present manual shall be performed within the prescribed schedule.
¢
THE WARRANTY SHALL BE NULL AND VOID IN THE EVENT
OF NON-COMPLIANCE WITH ANY OF THE ABOVE CONDITIONS.
PRESENTATION
The machine has been designed for an outdoor mouted application, ensuring perfectly weatherproof circulation
of the air within the compartments.
The RT is design very compact and it has an optimal foot print/weight ratio. Numerous accessoires and options
can be added to the basic version to adapt it perfectly to the client’s specific requirements. All units are charged
and tested at the factory and are supplied ready to start for quick and easy commissioning.
INSTRUCTIONS FOR FILLING IN THE "1st START-UP FORM"
(SEE APPENDIX)
It is the responsibility of the OWNER to make sure that the "1st Start-up Form" is fully filled in by the authorized
Service Centre and sent by registered mail - notified in advance by fax - to the After-Sales Service of the constructor
within 8 days of the initial start-up.
Failure to receive the form on the part of the constructor will render the guarantee null and void.
Содержание Rooft@ir 100
Страница 2: ......
Страница 28: ......
Страница 29: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO ...
Страница 33: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO V RT100 RT110 2308 3400 3326 1777 1813 3328 2200 900 651 50 170 ...
Страница 34: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO VI 532 A B EXHAUST BLOWER 40 50 60 70 80 100 110 A 642 690 B 828 910 ...
Страница 37: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO IX AIR FLOW AIR RETURN 445 178 50 D A C 130 50 397 B 260 RT40 RT50 ...
Страница 50: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XXII RT40 RT50 CONTROL pCO1 1 3 1 4 1 3 1 4 ...
Страница 51: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XXIII POWER AS L1 A1 A3 L2 L3 T1 T2 T3 ...
Страница 52: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XXIV 5 0 ...
Страница 53: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XXV RT60 RT70 RT80 CONTROL pCO1 ...
Страница 54: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XXVI RT100 RT110 CONTROL pCO1 ...
Страница 55: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XXVII POWER AS L1 A1 A3 L2 L3 T1 T2 T3 RT60 RT70 RT80 RT100 RT110 ...
Страница 56: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XXVIII 5 0 5 0 ...
Страница 57: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XXIX ...
Страница 58: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XXX ...
Страница 64: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO XXXVI ...