18
PlayHouse Assembly Instructions
Fig. 11
K. Awning
1. Slide Awning Support through pocket on Awning bottom as shown in (Fig. 11).
2. Attach 1/2’’ of the top of the Awning to the top board using (5) 1/4’’ screws and washers as shown in (Fig. 11a).
3. Attach Awning Support to 3’’ x 3’’ uprights with (1) 2’’ Lag Screw per side.
4. Push lightly down on the Awning Support to make the Awning taught, as shown in (Fig. 11b). While one person maintains the
pressure on the Awning, have a helper secure the Awning Support in place with (1) additional 2’’ Lag screw on each side of the
Awning Bar, as shown in (Fig. 11c).
Fig. 11c
Slide Support Through Pocket
on Awning
2’’ Lag screw
Tarp Washer
3/4’’ Pan Head screw
Fig. 11b
Fig. 11a
1-1/2’’
(5) 3/4’’ Pan Head Screws
and
(5) Tarp Washers
(1)
2’’ Lag Screw
Per Side
(1)
2’’ Lag Screw
Per Side
Содержание Four Foot Tower
Страница 29: ...Swing N Slide 2014 Printed In USA LA 7315 Questions Call our Customer Service Department at 1 800 888 1232 R...
Страница 57: ...Swing N Slide 2014 Printed In USA LA 7319 Questions Call our Customer Service Department at 1 800 888 1232 R...
Страница 77: ...Swing N Slide 2014 Printed In USA LA 7322 Questions Call our Customer Service Department at 1 800 888 1232 R...
Страница 89: ...Swing N Slide 2014 Printed In USA LA 7321 Questions Call our Customer Service Department at 1 800 888 1232 R...