Swing-N-Slide Four Foot Tower Скачать руководство пользователя страница 79

Installation Safety 

– Have You: 

Consulted the assembly instructions supplied with your particular model?
Noted this accessory is to be used only on Swing•N•Slide approved designs? (Do not alter its design or add/remove components, this accessory is intended
for wooden playsets only, do not install on metal frame playsets).
Made sure all hardware is tightened securely? (Supplied bolt covers must also be fastened securely.)
Using a hacksaw, cut off all protruding threaded ends of bolts and other fasteners and remove any sharp edges with 
a metal file as needed, and coated fastener ends with lead free paint?
Placed the equipment on level ground, not less than six feet (1.8 meters) from any structure or obstruction such as a fence, garage, house, overhanging
branches, laundry lines, or electrical wires?
Made sure home playground equipment is not installed over concrete, asphalt, packed earth or any other hard surface? (A fall onto a hard surface can re-
sult in serious injury to the equipment user.)
Verified that suspended climbing ropes, chain,or cable are securely anchored at both ends and cannot be looped back unpon itself?
Consulted in assembly instructions of your particular model for minimum use zones?
Used a water sealant on your play set to protect the wood and prevent cracking and warping? (Apply water sealant directly after assembly is complete. If 
you live in a coastal area, it is advisable to apply a clear coat finish to all metal parts to discourage rust). 
Followed all anchoring and shock absorbing surfacing requirements on the back of this sheet as they apply?
Made sure not to allow children to use equipment until it is properly installed?
Made sure to adjust all swings so there is a minimum 8'' clearance between the swing and the ground surface?
If project requires more than one day to complete, made certain to anchor the tower as soon as it is constructed? 
Do not leave the tower unanchored overnight. 

Operating Safety 

– Have You:

Determined that on-site adult supervision is provided for children of all ages?
Warned children the following before allowing them to use the equipment?

Not to walk close to, in front of, behind or between moving items.
Not to twist swing or any other accessory chains or ropes or loop them over the top support bar since this will reduce the strength of chain or rope.
Not to stand on swing seats.
Not to swing empty seats or other accessories.
Not to  slide down swing chains.
Be sure to sit in the center of the swing seat and other accessories with full weight on the seat.
Not to attach items to the playground equipment that are not specifically designed for use with the equipment such as but not limited to, jump
ropes, clotheslines, pet leashes, cables and chain. They may cause a strangulation hazard.
Not to climb or walk on the top of swing beams, railings or roof.
Not to use equipment in a manner other than intended.
Not to get off equipment while it is in motion.
Not to climb on the equipment when it is wet.
Be sure to go down slides feet first.

Determined that only one child per planned occupant seat should be allowed on this set at one time.
Determined children must be dressed appropriately for play. Avoid hooded jackets, bicycle or other sports helmets, clothing with draw strings and loose
fitting clothes which could become entangled or snagged on equipment.
Determined that suspended climbing ropes, chain, or cable are securely anchored at both ends and cannot be looped back upon itself.
Made certain the slide is placed so that it is not in direct sunlight.

Safety Maintenance 

– Follow these preventive maintenance instructions at the intervals required:

Use of weed trimmers too close to board surfaces will cause damage to the wood and compromise protection against rot and insect infestation.
To prevent the deterioration of materials, remove plastic swing seats and other plastic accessories when outdoors temp dips down to or below 32° F and
take indoors. Reinstall these plastic elements at the beginning of each play season.
At the beginning of each play season check metal parts for rust. If found, sand and repaint using a non lead-based paint meeting the

requirements of 16 CFR 1303 or SOR/2005-109.

At the beginning of each play season and once a month during each play season, check all moving parts for wear, rust or other 
deterioration. Replace as needed. If any of these conditions exist, call 1-800-888-1232 to order replacement accessories.
At the beginning of each play season and once a month during each play season lubricate metallic moving parts.
At the beginning of each play season and twice a month during each play season, check all protective coverings on bolts, pipes, edges, and corners. 
Replace if they are loose, cracked, or missing.
At the beginning of each play season and twice a month during each play season, rake and check depth of loose fill protective 
surfacing material to prevent compaction and maintain appropriate depth. Replace as necessary. 
At the beginning of each play season and twice a month during each play season tighten all hardware.
At the beginning of each play season and twice a month during each play season, check all wood members for deterioration and 
splinters. Sand down splinters and replace deteriorating wood members.

Disposal Instructions

When the equipment is taken out of service, it must be disassembled and disposed of in such a way that no unreasonable hazards will exist at the time the set is dis-
carded.

Important!  Additional Safety Instructions for all Swing-N-Slide Playground Equipment. 

Save this instruction sheet in the event the manufacturer needs to be contacted.

Observing the following statements and warnings reduces the likelihood of serious or fatal injury

Safety Checklist for Swing-N-Slide Play Sets and Accessories

R

2

Содержание Four Foot Tower

Страница 1: ...instructions in this plan FIRST familiarize yourself with these instructions then follow the individual plans in the order shown building your 4 Foot Tower first 5 Foot Tower second Playhouse third a...

Страница 2: ...web site at www swing n slide com or call us at 1 800 888 1232 ASSEMBLY INSTRUCTIONS check out http www swing n slide com planupdates htm for updates to these instructions No of Children Up to 10 Min...

Страница 3: ...op of swing beams railings or roof Not to use equipment in a manner other than intended Not to get off equipment while it is in motion Not to climb on the equipment when it is wet Be sure to go down s...

Страница 4: ...conditions for a period of 5 years MANUFACTURER S 5 YEAR LIMITED WARRANTY Swing N Slide warrants its No Cut and Wood Complete Ready to Assemble Play Set kits against wood rot and termite damage and t...

Страница 5: ...head screws 110 1 1 2 screws ELECTRIC DRILL 1 2 SOCKET WRENCH HAMMER TAPE MEASURE SAFETY GLASSES DUST MASK 1 3 8 DRILL BIT PHILLIPS BIT CARPENTER S SQUARE TOOLS REQUIRED 1 T30 Torx Bit 1 T20 Torx Bit...

Страница 6: ...AGES 2 10 YEARS For Home Residential Use ONLY 1212 Barberry Drive Janesville WI 53545 1 800 888 1232 w w w swing n slide com R 1 Name Plate 1 Play Handle 1 Window Frame 8 Shelf Loc 4 Wrap Loc 3 13 3 4...

Страница 7: ...2 2 1 x 4 x 15 1 4 Shutter 1 1 x 4 x 7 Window Top 1 1 x 4 x 19 3 4 1 1 x 4 x 13 1 2 1 1 x 4 x 20 1 2 1 1 x 4 x 25 3 4 17 1 x 4 x 33 2 1 x 4 x 33 Window Sides 2 1 x 4 x 41 1 4 4 1 x 4 x 46 21 1 x 4 x...

Страница 8: ...correct fastener s for the lumber attachment you are making Each diagram will highlight the correct number of fasteners to use and where to attach them 1 x 4 to 3 x 3 1 x 4 to 1 x 4 IMPORTANT ASSEMBL...

Страница 9: ...WRONG Brackets Clip Together brackets NOT interlocked Brackets clipped Example of a Shelf Loc bracket connection TOP Look for TOP stamp on bracket for correct orientation DO NOT USE LAG SCREWS HERE U...

Страница 10: ...as shown in Fig 1a Note Secure Shelf Lock with 2 Lag Screws only at this time Fig 1a 3 x 3 x 94 Look for TOP stamp on brackets while installing TOP GAP on this side 2 1 1 4 Lag Screws per joint 1 1 4...

Страница 11: ...ion cont 2 Attach boards as shown in Fig 2 through Fig 2c Fig 2 Double check to make sure structure is square 3 2 1 2 screws per joint 3 2 1 2 screws per joint 2 x 4 x 47 1 2 1 x 4 x 47 1 2 NOTE Upper...

Страница 12: ...in Fig 3 Note Secure Shelf Lock with 2 Lag Screws only at this time Fig 3 Frame 2 Construction 3 x 3 x 94 2 1 1 4 Lag Screws per joint 1 1 4 Lag screw 2 1 1 4 Lag Screws per joint Fig 3a Look for TOP...

Страница 13: ...1 x 4 x 47 1 2 3 2 1 2 screws per joint Frame 2 Construction cont 2 Attach boards as shown in Fig 4 through Fig 4b Fig 4 3 2 1 2 screws per joint 3 2 1 2 screws per joint 2 x 4 x 47 1 2 1 x 4 x 47 1...

Страница 14: ...shown Fig 5 Frame 1 2 1 2 screw NOTE Upper screws are 2 1 1 4 Lag Screws Lower screws are 3 2 Lag Screws Fig 5a Fig 5b 2 1 1 4 Lag 3 2 Lag 1 1 4 Lag screw 2 Lag screw 2 1 1 4 lag screws and 3 2 lag sc...

Страница 15: ...ights on all four sides of the tower should be 47 1 2 Fig 6 1 x 4 x 13 1 2 3 2 1 2 screws per joint 4 1 1 4 screws Frame 1 Frame 2 2 1 2 screw 1 1 4 Lag screw 2 Lag screw NOTE Upper screws are 2 1 1 4...

Страница 16: ...2 Attach 2 x 4 to deck boards using 2 1 2 screws as shown in Fig 7 3 Attach 1 x 4 Slide Support as shown in Fig 7a 2 1 2 screw Fig 7a 2 2 1 2 screws per joint 2 2 1 2 screws per joint Fig 7 2 x 4 x 4...

Страница 17: ...4 deck boards to structure as shown Fig 8 2 Use two 2 1 2 screws at center and each end of deck boards Note Screws at center will attach to center support 2 1 2 screw Fig 8 2 2 1 2 screws per joint 1...

Страница 18: ...1 Attach 1 x 4 support boards as shown in Fig 15 2 Attach 3 1 x 4 Barrier Boards evenly spaced as shown in Fig 15a Fig 15a 2 1 2 screw 2 1 x 4 x 47 1 2 3 1 x 4 x 33 3 4 NOTE There must be a 1 1 2 Nom...

Страница 19: ...per board FLUSH FLUSH FLUSH Install Tunnel Support Boards 1 Install 3 2 x 4 Tunnel Support Boards to structure as shown Fig 15b Note 1 1 2 Screws must be inserted from outside unit through 1 x 4 board...

Страница 20: ...upports 1 Install 1 x 4 barrier support boards as shown in Fig 16 and Fig 16a Fig 16 3 1 x 4 x 47 1 2 29 1 2 MEASURED FROM TOP OF DECK 1 x 4 x 20 1 2 3 2 1 2 screws per joint 5 2 1 2 screws per Board...

Страница 21: ...w Frame with Opening Fig 17a 4 1 x 4 x 33 1 2 x 4 x 33 2 1 x 4 x 33 2 1 x 4 x 33 Window Cut 1 1 x 4 x 9 3 4 Window Bottom 1 1 x 4 x 7 Window Top Flush With Barrier Boards 2 1 1 4 deck screws per joint...

Страница 22: ...nstall 1 x 4 barrier support board and barrier boards as shown in Fig 18 and Fig 18a Fig 18 3 2 1 2 screws per joint Fig 18a 1 x 4 x 47 1 2 8 1 x 4 x 33 2 1 1 4 deck screws per joint NOTE There must b...

Страница 23: ...oof Frame into place and secure to each upright using 3 2 1 2 screws per joint Fig 19b 6 1 1 4 deck screws per plate Roof Support Plate 1 1 2 screw Fig 19a 3 2 1 2 screws per joint 2 x 4 x 3 8 1 2 1 1...

Страница 24: ...ke certain to place screws through the thickest areas of the Roof Slat Boards as shown in Fig 20b 2 1 1 2 deck screws per joint Fig 20a 1 1 4 screw 1 1 2 screw 12 1 x 6 x 47 1 2 2 1 x 4 x 38 1 2 1 x 4...

Страница 25: ...tive Board and Window Dressing 1 Secure protective 1 x 4 barrier board as shown in Fig 21 2 Attach Window Sill and Shutters as shown in Fig 21a Fig 21a 2 1 1 4 screws per joint 2 1 2 screw 1 x 4 x 47...

Страница 26: ...4 washer 1 4 washer 1 3 4 Panhead screw 1 3 4 Panhead screw 1 3 4 Panhead screw Safety Handles 1 Mount safety handles in the Ladder opening approximately 11 above the deck surface Fig 22 2 Reference p...

Страница 27: ...r joint 6 1 1 2 screws per side 2 1 1 4 Lag screws per rung LADDER ASSEMBLY TO AVOID A POSSIBLE ENTRAPMENT ISSUE MAKE SURE TO ATTACH THE RUNG SO THAT BODY OF THE RUNG IS FACING INWARD BODY OF RUNG MUS...

Страница 28: ...the metal strap through the loop of the Anchor It stake and secure it to the unit with a lag screw and washer as illustrated to the right Note Attach the strap to the unit with as little play as poss...

Страница 29: ...Swing N Slide 2014 Printed In USA LA 7315 Questions Call our Customer Service Department at 1 800 888 1232 R...

Страница 30: ...Five Foot Tower Swing N Slide 1212 Barberry Drive Janesville Wisconsin 53545 Visit our web site at www swing n slide com or call us at 1 800 888 1232 ASSEMBLY INSTRUCTIONS R...

Страница 31: ...2 1 x 4 x 15 1 2 2 1 x 4 x 15 1 4 Shutter 1 1 x 4 x 7 Window Top 1 1 x 4 x 19 3 4 1 1 x 4 x 13 1 2 1 1 x 4 x 20 1 2 1 1 x 4 x 25 3 4 22 1 x 4 x 33 2 1 x 4 x 33 Window Sides 2 1 x 4 x 41 1 4 4 1 x 4 x...

Страница 32: ...rackets on 3 x 3 as shown in Fig 1 Note Secure Shelf Lock with 2 Lag Screws only at this time Fig 1 3 x 3 x 94 2 1 1 4 Lag Screws per joint 2 2 Lag Screws per joint 1 1 4 Lag screw 2 1 1 4 Lag Screws...

Страница 33: ...ction cont 2 Attach boards as shown in Fig 2 through Fig 2c Fig 2 Double check to make sure structure is square 3 2 1 2 screws per joint 3 2 1 2 screws per joint 2 x 4 x 47 1 2 1 x 4 x 47 1 2 NOTE Upp...

Страница 34: ...ame 2 Construction 1 Measure and position brackets on 3 x 3 as shown in Fig 3 Note Secure Shelf Lock with 2 Lag Screws only at this time Fig 3 Frame 2 Construction 3 x 3 x 94 2 1 1 4 Lag Screws per jo...

Страница 35: ...1 x 4 x 47 1 2 3 2 1 2 screws per joint Frame 2 Construction cont 2 Attach boards as shown in Fig 4 through Fig 4b Fig 4 3 2 1 2 screws per joint 3 2 1 2 screws per joint 2 x 4 x 47 1 2 1 x 4 x 47 1 2...

Страница 36: ...1 1 4 Lag Screws Lower screws are 3 2 Lag Screws Fig 5a Fig 5b 2 1 1 4 Lag 3 2 Lag 1 1 4 Lag screw 2 Lag screw 2 1 1 4 lag screws and 3 2 lag screws per bracket 3 2 1 2 screws per joint 3 2 1 2 screws...

Страница 37: ...should be 47 1 2 Fig 6 3 2 1 2 screws per joint 3 2 1 2 screws per joint Frame 1 Frame 2 1 1 4 Lag screw 2 Lag screw NOTE Upper screws are 2 1 1 4 Lag Screws Lower screws are 3 2 Lag Screws Fig 6a Fi...

Страница 38: ...2 Attach 2 x 4 to deck boards using 2 1 2 screws as shown in Fig 7 3 Attach 1 x 4 Slide Support as shown in Fig 7a 2 1 2 screw Fig 7a 2 2 1 2 screws per joint 2 2 1 2 screws per joint Fig 7 1 x 4 x 41...

Страница 39: ...4 deck boards to structure as shown Fig 8 2 Use two 2 1 2 screws at center and each end of deck boards Note Screws at center will attach to center support 2 1 2 screw Fig 8 2 2 1 2 screws per joint 10...

Страница 40: ...port Board as shown in Fig 9a Note You will need to spread the Shelf Brackets open to easily slide the 4 x 4 into the brackets 2 1 2 screw 1 x 4 x 47 1 2 3 2 1 2 screws per joint 4 x 4 x 47 1 2 Tip Fl...

Страница 41: ...Washer Wood Loc Washer Wood Loc Washer Wood Loc Washer A Frame 3 8 Hole Locations Attach This End To Playset 1 1 2 6 1 2 Fig 9b Swing Beam Hole Locations 1 Tap Wood Loc Washer and Carriage Bolt into...

Страница 42: ...sliding over two carriage bolts refer to Fig 9b for placement and apply two washers and two loc nuts per Swing Hanger Make certain to orient swing hanger as shown in Fig 9d Note When attaching Quick...

Страница 43: ...g 9e 2 Align EZ Frame Bracket with face of 3 x 3 1 2 s 3 Secure EZ Frame Bracket with 8 2 1 2 screws to 3 x 3 1 2 s making sure they are flush with each other 4 Secure 2 x 4 to 3 x 3 1 2 s as shown in...

Страница 44: ...her A Frame Assembly cont 1 Align EZ Frame Bracket with carriage bolts on Swing Beam as shown in Fig 9g 2 Attach A Frame beam to Swing Beam using 2 washers and 2 Loc Nuts and 2 screws as shown in Fig...

Страница 45: ...ew x 8 each bracket A Frame Assembly cont 1 Position Split Brackets on 4 x 4 x 47 1 2 as shown in Fig 9h 2 With the help of others lift A Frame and Swing Beam Assembly and center onto unit as shown in...

Страница 46: ...ch 8 1 x 4 Barrier Boards evenly spaced as shown in Fig 9j Fig 9j 8 1 x 4 x 33 NOTE There must be a 1 1 2 Nominal Gap between all barrier boards and 3 x3 uprights 2 1 1 4 deck screws per joint Use 2 1...

Страница 47: ...Instructions 2 1 2 screw Barrier Supports 1 Install 1 x 4 barrier support boards as shown in Fig 10 Fig 10 1 x 4 x 20 1 2 5 2 1 2 screws per Board 1 x 4 x 25 3 4 5 2 1 2 screws per Board PRE DRILL BO...

Страница 48: ...me with Opening Fig 11a 4 1 x 4 x 33 1 2 x 4 x 33 2 1 x 4 x 33 2 1 x 4 x 33 Window Cut 1 1 x 4 x 9 3 4 Window Bottom 1 1 x 4 x 7 Window Top Flush With Barrier Boards 2 1 1 4 deck screws per joint 8 3...

Страница 49: ...stall 1 x 4 barrier support board and barrier boards as shown in Fig 12 and Fig 12a Fig 12 3 2 1 2 screws per joint Fig 12a 1 x 4 x 47 1 2 8 1 x 4 x 33 2 1 1 4 deck screws per joint NOTE There must be...

Страница 50: ...th the assistance of another person lift the Roof Frame into place and secure to each upright using 2 2 1 2 screws per joint Fig 13b 6 1 1 4 deck screws per plate 1 1 2 screw Fig 13a 2 2 1 2 screws pe...

Страница 51: ...e certain to place screws through the thickest areas of the Roof Slat Boards as shown in Fig 14b 2 1 1 2 deck screws per joint Fig 14a 1 1 4 screw 1 1 2 screw 12 1 x 6 x 47 1 2 1 x 4 x 3 8 1 2 1 2 Fig...

Страница 52: ...crews per lamination 2 1 1 2 screws per joint 1 1 2 screw 1 1 4 Lag screw 2 1 1 4 Lag screws per rung 3 screw 2 1 2 screw LADDER ASSEMBLY TO AVOID A POSSIBLE ENTRAPMENT ISSUE MAKE SURE TO ATTACH THE R...

Страница 53: ...sing 1 Install Shutters and Window Sill as shown in Fig 16 Fig 16 2 1 1 4 screws per Board Swing BeamSafety Barrier 1 Install Swing Beam Safety Barrier as shown in Fig 16a Fig 16a 2 1 2 screw 3 2 1 2...

Страница 54: ...the ground until only the loop is exposed 3 Place the metal strap through the loop of the Anchor It stake and secure it to the unit with a lag screw and washer as illustrated to the right Note Attach...

Страница 55: ...d 8 exposed from ground 3 Install Dicovery Mountain as shown in Fig 19b using 4 2 lag screws in top flange 2 1 1 4 panhead screws through left side flange and 1 1 1 4 panhead screw through right side...

Страница 56: ...y Instructions Attach Swings onto Swing Hangers 1 Attach the end link of each Swing Chain to one Quick Link as shown in Fig 20 Make certain to secure each Quick Link in the closed position by using an...

Страница 57: ...Swing N Slide 2014 Printed In USA LA 7319 Questions Call our Customer Service Department at 1 800 888 1232 R...

Страница 58: ...lide com or call us at 1 800 888 1232 ASSEMBLY INSTRUCTIONS check out http www swing n slide com planupdates htm for updates to these instructions No of Children Up to 10 Min Use Zone 26 x 29 Set Dim...

Страница 59: ...op of swing beams railings or roof Not to use equipment in a manner other than intended Not to get off equipment while it is in motion Not to climb on the equipment when it is wet Be sure to go down s...

Страница 60: ...conditions for a period of 5 years MANUFACTURER S 5 YEAR LIMITED WARRANTY Swing N Slide warrants its No Cut and Wood Complete Ready to Assemble Play Set kits against wood rot and termite damage and t...

Страница 61: ...H HAMMER TAPE MEASURE SAFETY GLASSES DUST MASK 3 8 DRILL BIT 6 Min PHILLIPS and STRAIGHT BIT CARPENTER S SQUARE TOOLS REQUIRED 1 T30 Torx Bit 1 T20 Torx Bit 16 3 4 screws 5 3 4 panhead screws 6 3 4 Tr...

Страница 62: ...5 2 Window Frame PlayHouse Plan 1 Plan 2 Flower Box 2 Bench Supports 2 L Brackets 2 Table Supports 1 Awning Support 1 Awning...

Страница 63: ...Window Top 2 1 x 4 x 14 4 1 x 4 x 40 Window Cut 2 1 x 5 x 47 1 2 Drape Cut 2 1 x 4 x 19 9 1 x 4 x 22 1 4 5 1 x 4 x 34 21 1 x 4 x 40 1 1 x 5 x 46 Drape Cut 1 1 x 5 x 29 Offset Arch 2 1 x 6 x 47 1 2 1...

Страница 64: ...highlight the correct number of fasteners to use and where to attach them 1 x 4 to 3 x 3 1 x 4 to 1 x 4 2 1 1 4 screws Use 1 1 4 screws when mounting 1 x 4 boards to 1 x 4 boards IMPORTANT ASSEMBLY N...

Страница 65: ...8 PlayHouse Assembly Instructions A Deck Support 1 Attach Deck Support Board as shown in Fig 1 Fig 1 4 2 1 2 screws 1 x 4 x 40 2 1 2 screw...

Страница 66: ...bly Instructions Fig 2 3 2 1 2 screws per joint 3 2 1 2 screws per joint 1 x 5 x 46 Drape Board 1 x 5 x 47 1 2 Drape Board 3 4 Offset Both Sides B Wall Supports 1 Attach 2 PlayHouse wall supports as s...

Страница 67: ...rate proper board alignment Fig 3a Fig 3 INSIDE VIEW 11 1 x 4 x 40 1 1 x 4 x 40 1 1 x 4 x 40 Window Cut 1 1 x 4 x 14 Window Bottom 2 1 1 4 deck screws per joint 1 1 x 4 x 14 Window Bottom 2 1 x 4 x 40...

Страница 68: ...structions Fig 4 D Install Window Frames 1 Install Window Frame as shown in Fig 4 NOTE You may need to adjust Window Top Board to properly align Window Frame with Opening 8 3 4 Flat Head screws Per Wi...

Страница 69: ...rch boards as shown in Fig 5 2 Attach Barrier 2 Support Boards as shown in Fig 5 and Fig 5a Fig 5 3 2 1 2 screws per joint 3 2 1 2 screws per joint 2 1 2 screw 1 x 5 x 47 1 2 Drape Board 1 x4 x 19 1 x...

Страница 70: ...13 PlayHouse Assembly Instructions Fig 6 4 1 1 4 screws F Deck Support 1 Attach Deck Support Board as shown in Fig 6 1 x 4 x 40 1 1 4 screw...

Страница 71: ...g 7b Fig 7 2 1 1 4 screws per joint 2 1 x 4 x 40 4 1 x4 x 34 Fig 7a 2 1 1 4 deck screws per joint 2 1 1 4 deck screws per joint 9 1 x 4 x 22 1 4 1 1 2 Offset Fig 7b Ladder Removed For Clarity 1 1 4 sc...

Страница 72: ...House Assembly Instructions Fig 8 2 1 1 4 screws per joint 1 x 4 x 40 H Barrier Supports 1 Attach Barrier Support Boards as shown in Fig 8 and Fig 8a 4 2 1 2 screws 1 x 4 x 34 Fig 8a 1 1 4 screw 2 1 2...

Страница 73: ...locations of L Brackets on 1 x 6 board and drill one 3 8 hole at each marked spot 5 Secure 1 x 6 boards to L Braces as shown in Fig 9c Fig 9b PicnicTable Brackets 1 x4 x7 1 4 1 1 4 screw 2 2 Lag Screw...

Страница 74: ...kets as shown in Fig 10a 3 Using the Picnic Bench Brackets as a template mark each hole location 4 Drill one 3 8 hole at each location 5 Secure the Picnic Bench in to the Picnic Bench Brackets as show...

Страница 75: ...Lag Screw per side 4 Push lightly down on the Awning Support to make the Awning taught as shown in Fig 11b While one person maintains the pressure on the Awning have a helper secure the Awning Support...

Страница 76: ...rew locations 2 Drive in screws leaving a 1 8 Gap between the Screw Head and the wood surface 3 Install the Flower Box and tighten all hardware as shown in Fig 12 4 Attach Window Sill and Shutters as...

Страница 77: ...Swing N Slide 2014 Printed In USA LA 7322 Questions Call our Customer Service Department at 1 800 888 1232 R...

Страница 78: ...545 Visit our web site at www swing n slide com or call us at 1 800 888 1232 ASSEMBLY INSTRUCTIONS check out http www swing n slide com planupdates htm for updates to these instructions Min Use Zone 3...

Страница 79: ...op of swing beams railings or roof Not to use equipment in a manner other than intended Not to get off equipment while it is in motion Not to climb on the equipment when it is wet Be sure to go down s...

Страница 80: ...conditions for a period of 5 years MANUFACTURER S 5 YEAR LIMITED WARRANTY Swing N Slide warrants its No Cut and Wood Complete Ready to Assemble Play Set kits against wood rot and termite damage and t...

Страница 81: ...TRIC DRILL 1 2 SOCKET WRENCH HAMMER TAPE MEASURE SAFETY GLASSES DUST MASK PHILLIPS BIT CARPENTER S SQUARE TOOLS REQUIRED Tower Tunnel Plan 1 Plan T20 Torx Bit 22 1 1 2 screws 22 1 1 2 lag bolts 44 loc...

Страница 82: ...5 2 Double Lip Section 2 Single Lip Section 2 Entry Panel 2 2 x 4 x 23 1 4 2 1 x 4 x 27 3 4 1 2 x 4 x 34 Tower Tunnel Board List LIP LIP NO LIP LIP...

Страница 83: ...6 Tower Tunnel Assembly Instructions Fig 1 5 1 x 4 x33 Remove Barrier Boards 1 Remove 5 Barrier Boards as shown in Fig 1 60 DECK HEIGHT TOWER...

Страница 84: ...ture as shown Fig 2 Note 1 1 2 Screws must be inserted from outside unit through 1 x 4 boards and into 2 x 4 boards Fig 2 NOTE Roof removed for clarity 2 2 x 4 x 23 1 4 2 x 4 x 34 23 1 4 1 1 2 screw U...

Страница 85: ...8 Tower Tunnel Assembly Instructions 4 1 1 2 screws per board AttachExterior Support Boards 1 Attach 2 1 x 4 Support boards as shown in Fig 3 Fig 3 1 x 4 x 27 3 4 1 x 4 x 27 3 4 1 1 2 screw...

Страница 86: ...ighten hardware at this time Note Refer to Fig 4b for proper hardware use 2 Rotate assembled links so that the connecting surfaces mate without any interference Bolt the two completed links together a...

Страница 87: ...ously assembled Crawl Tube ONLY where arrows indicate in Fig 5a and Fig 5b Note FULLY TIGHTEN all bolted joints at this time Note Panels are attached opposite one another Make certain one is attached...

Страница 88: ...Fig 6 Attach Tunnel Assembly To Towers 1 Attach Tower Tunnel Between Towers using 11 1 1 4 Lag Screws per Entrance Panel as shown in Fig 6 Note Refer to Fig 6a for proper hardware use Washer 1 1 2 La...

Страница 89: ...Swing N Slide 2014 Printed In USA LA 7321 Questions Call our Customer Service Department at 1 800 888 1232 R...

Отзывы: