background image

9

-

Understanding how the Bracket System Works

Cup-Loc

GAP

Introduction to the Bracket system

1. ALWAYS

Use 2'' lag screws on all brackets. 

2.

Brackets ''clip'' to each other. 

NEVER 

position in 

a non-interlocking position.

Top

of bracket

Bottom

of bracket

(Hole locations close to bottom)

Example of a Shelf-Loc bracket connection.

Wrap-Loc

Shelf-Loc Bracket

1

2

3

4

Wrap-Loc

CORRECT!

WRONG!

Brackets Clip Together

brackets NOT

interlocked!

Brackets

''clipped'' 

Example of a Cup-Loc bracket connection.

TOP

Look for ''TOP'' stamp on

bracket for correct orientation.

Meijer.com

Содержание Alpine 611

Страница 1: ...ww swing n slide com or call us at 1 800 888 1232 ASSEMBLY INSTRUCTIONS PROJECT 611 612 check out http www swing n slide com planupdates htm for updates to these instructions No of Children Up to 11 Min Use Zone 28 1 2 x 30 1 2 Set Dim 13 W x 18 1 2 L x 11 H Est Building Time 4 8 hr 28 5 30 5 Meijer com ...

Страница 2: ...se a strangulation hazard Not to use equipment in a manner other than intended Not to get off equipment while it is in motion Not to climb on the equipment when it is wet Determined that only one child per planned occupant seat should be allowed on this set at one time Determined children must be dressed appropriately for play Avoid clothing with draw strings and loose fitting clothes which could ...

Страница 3: ... Par exemple une glissoire qui se prolonge au delą de la plate forme doit źtre pourvue dʼune surface de protection dʼau moins 1 828 m 6 pieds de chaque côté ainsi quʼą lʼextrémité En ce qui concerne les balanćoires la zone de protection doit couvrir au moins 14 pi 6 m autant devant que derriŹre la balanćoire lorsque celle ci est immobile IMPORTANT Ce produit est conću uniquement pour un usage rési...

Страница 4: ...1 4 flat washers 6 T nuts 2 1 2 panhead screws 2 1 3 4 panhead screws 2 5 1 2 Bolts 4 1 Truss Screws 108 2 lag screw CIRCULAR SAW ELECTRIC DRILL 1 2 SOCKET WRENCH HAMMER TAPE MEASURE SAFETY GLASSES DUST MASK 3 8 DRILL BIT 6 Min PHILLIPS BIT CARPENTER S SQUARE TOOLS REQUIRED Meijer com ...

Страница 5: ... ONLY 1212 Barberry Drive Janesville WI 53545 1 800 888 1232 www swing n slide com PROCESS BLACK PANTONE NEWCO RED R R R 1 Name Plate 10 Step Brackets Note 5 Left 5 Right 1 Plan 2 Safety Handles 1 T30 Torx Bit 2 EZ Frame Brackets 1 Instructional DVD Alpine Plan 1 Multicolor Tarp 2 Shelf Loc 10 Cup Loc 6 Wrap Loc 2 Split Beam bracket Meijer com ...

Страница 6: ...6 287 2 1 2 screws 56 2 screws e ALPINE REQUIRED HARDWARE Not Included 64 1 1 4 screws Meijer com ...

Страница 7: ...7 ALPINE Meijer com ...

Страница 8: ...boards to the 4 x4 uprights as shown How to select the correct fastener Use these 3 pictorial guides to help select the correct fastener s for the lumber attachment you are making Each diagram will highlight the correct number of fasteners to use and where to attach them Base of unit 5 4 x 6 to 4 x 4 2 x 4 to 4 x 4 5 4 x 6 to 2 x 4 1 2 lag screw After attaching the 2 1 2 screws apply the center 1 ...

Страница 9: ...ition in a non interlocking position Top of bracket Bottom of bracket Hole locations close to bottom Example of a Shelf Loc bracket connection Wrap Loc Shelf Loc Bracket 1 2 3 4 Wrap Loc CORRECT WRONG Brackets Clip Together brackets NOT interlocked Brackets clipped Example of a Cup Loc bracket connection TOP Look for TOP stamp on bracket for correct orientation Meijer com ...

Страница 10: ...ame Construction 1 Measure and position brackets on 4 4 x 4 x 96 as shown in Fig 1 x 8 4 each bracket Repeat 4x 2 Lag screw Fig 1 REMEMBER Brackets are inter locking Cup loc will clip and secure into the Wrap Loc as shown below GAP Meijer com ...

Страница 11: ...ket in place for later use Look for TOP stamp on brackets while installing TOP GAP on this side A Frame Construction cont 2 Install upper Wrap Brackets to Frame 2 as shown in Fig 2a Fig 2a Fig 2 lag screw to hold in place back lag screw to hold in place back WARNING Avoid splitting your lumber by offsetting your screws or nails at least 3 4 from the edge Frame 2 Meijer com ...

Страница 12: ... 4 x 55 2 x 4 x 55 5 4 x 6 x 55 5 4 x 6 x 55 Frame 1 Frame 2 3 2 1 2 screws nails 4 2 1 2 screws nails 1 Lag Screw 4 2 1 2 screws nails 1 Lag Screw 3 2 1 2 screws nails 2 Lag screw A Frame Construction cont 4 Install lower 5 4 boards Edges are to be flush with 4 x 4 s 2 1 2 or 10D screw nail Meijer com ...

Страница 13: ... Attach upper 2 x 4 as shown in Fig 4 Edges are to be flush with 4 x 4 s A Frame Construction cont 6 Attach lower 5 4 boards as shown in Fig 4 Edges are to be flush with 4 x 4 s 3 2 1 2 screws nails 4 2 1 2 screws nails 1 Lag Screw 2 Lag screw Frame 1 2 1 2 or 10D screw nail Meijer com ...

Страница 14: ...n Fig 5 Edges are to be flush with 4 x 4 s 2 Lag screw 4 2 1 2 screws nails 1 Lag Screw x 3 Double check to make sure structure is square A Frame Construction cont 8 Install 4 x 4 beams as shown in Fig 6 9 Install lag screws at each corner location as shown in Fig 6a Fig 6 Fig 6a 4 x 4 x 47 1 2 4 x 4 x 47 1 2 4 x 4 x 35 1 2 4 x 4 x 35 1 2 Frame 2 Frame 1 Meijer com ...

Страница 15: ...e Center 2 2 1 2 screws nails each side B Center Support Beam cont 2 Secure center support beam to structure as shown in Fig 8 B Center Support Beam 1 Construct center support beam following the instructions in Fig 7 Center Support Beam 17 1 4 2 1 2 or 10D screw nail Meijer com ...

Страница 16: ... per joint C Install Deck Boards 1 Install 5 4 deck boards to structure as shown Fig 9 2 Use two 2 1 2 screws nails at center and each end of deck boards Note Screws Nails at center will attach to center support 5 4 x 6 x 36 2 1 2 or 10D screw nail Meijer com ...

Страница 17: ...s Bracket should be 1 2 from edge D Install 4x4 Rail Supports 1 Install 2 Cup Loc as shown in Fig 10 Fig 10a 2 Install 2 4 x 4 x 29 3 4 as shown in Fig 11 and Fig 11a 4 x 4 x 29 3 4 2 Lag screw x 3 2 Lag screw x 4 Install Cup Loc using 4 2 lag screws 9 1 8 from post 1 2 from edge both sides Meijer com ...

Страница 18: ... 12 Note Measure from Top of 5 4 board to top of 2 x 4 rail board F Install Lower Rail Boards 1 Install lower 2 x 4 rail boards as shown in Fig 13 Flush with the top of 4 x 4 deck supports 2 x 4 x 43 30 3 2 1 2 screws nails per joint 3 2 1 2 screws nails per joint 2 x 4 x 55 2 x 4 x 16 2 x 4 x 43 2 x 4 x 16 2 x 4 x 55 2 1 2 or 10D screw nail Meijer com ...

Страница 19: ...19 31 3 4 bottom of base Fig 14 5 4 x 6 x 55 4 2 1 2 screws nails G Install Protective Barrier Board 1 Secure protective 5 4 barrier board as shown in Fig 14 2 1 2 or 10D screw nail Meijer com ...

Страница 20: ...H Install Accessory Brackets 1 Secure Shelf Loc brackets onto Wrap Loc as shown in Fig 15 Fig 15a Fig 16 Fig 15a 2 Lag screw x 2 Tip Flex brackets to make installation of 4 x 4 easier Fig 16 Approx 1 4 Meijer com ...

Страница 21: ...21 Fig 17a Fig 17 I Install Accessory 4x4 1 Work 4 x 4 into brackets as shown in Fig 17 2 Secure brackets Fig 17a 2 Lag screw x 4 4 x 4 x 55 Meijer com ...

Страница 22: ...er on a flat surface and align all of the edges NOTE Make sure each piece of lumber is the same length If it is not trim board s 3 From the end of each board measure and place a mark at 24 intervals Fig 18 4 Assemble the beam by attaching each end together using three 2 1 2 screws Fig 18a Note Stagger the screws as shown in Fig 18a to insure a sturdy bond Repeat every 24 along the entire length of...

Страница 23: ...am Drill Locations 1 Use a 3 8 drill bit to drill a 3 8 hole through the beam at each location shown in Fig 19 2 Tap T nut into swing beam at locations shown 3 1 2 3 1 2 Drill 3 8 Hole S w i n g B e a m TOP VIEW Meijer com ...

Страница 24: ...swing hanger into the beam and thread it into the T nut until it is flush or near flush with the top of the T nut A screwdriver may be used to twist the hanger Fig 19a Orient swing hanger as shown in Fig 19a 4 Use 4 1 1 4 screws nails to secure beam clamp 5 Check hanger to ensure it does not spin 6 Repeat for all four hangers 4 1 1 4 screws Swing Hanger Use Screwdriver to aid in tightening Bottom ...

Страница 25: ...yout 4 x 4 s as shown in Fig 20 2 Align EZ Frame Bracket with face of 4 x 4 s 3 Secure EZ Frame Bracket with 8 2 1 2 screws nails to 4 x 4 s making sure they are flush with each other 4 Secure 5 4 x 6 to 4 x 4 s as shown in Fig 21 5 Flip over and add 2nd bracket Repeat steps 2 and 3 8 2 1 2ʼʼ Screws nails 4 2 1 2 screws nails 4 2 1 2 screws nails 2 1 2 or 10D screw nail Meijer com ...

Страница 26: ...ach A Frame beam to Swing Beam using 2 hex bolts and 4 screws nails 2 Tighten hex bolt to flush with top of T nut Repeat on other bracket Note If using Laminated Swing Beam make sure t nut teeth do not fall between seams of 2 x 6 s Fig 23 86 1 2 to ground 2 1 2 or 10D screw nail Meijer com ...

Страница 27: ...ket 25 1 2 L A Frame Assembly cont 1 Position Split Brackets on 4 x 4 x 55 Fig 24 2 With the help of others lift A Frame and Swing Beam Assembly and center onto unit as shown in Fig 24 3 Secure as shown in Fig 24a Fig 24 Swing Beam Swing Beam Meijer com ...

Страница 28: ... boards evenly spaced in the opening 6 5 4 x 6 x 48 5 4 x 6 x 30 5 4 x 6 x 30 2 2 screws nails 2 per joint top bottom 2 2 screws nails 2 per joint top bottom 2 2 screws nails 2 per joint top bottom 2 2 screws nails 2 per joint top and bottom Use 2 1 2 screws to secure to 5 4 x 6 to 4 x 4 2 or 8D screw nail 2 1 2 or 10D screw nail 2 or 8D screw nail Meijer com ...

Страница 29: ...1 Install 2 x 4 boards as shown N Install Tarp 1 Install tarp as shown in Fig 28a 2 Secure tarp in six locations Fig 27 Fig 28 1 1 4 screw 2 2 1 2 screws nails 2 2 1 2 screws nails 4 2 1 2 screws nails 4 2 1 2 screws nails Fig 28a 2 or 8D screw nail Meijer com ...

Страница 30: ...alignment Fig 29 2 Align top of step bracket with line and screw in place Install a ladder rung at each of the four locations Fig 29 30 Repeat on other ladder rail 3 Attach 2 x 4 x 23 1 4 to siderails using 2 2 1 2 screws nails per side 4 Secure ladder to unit Fig 31 Note The top step should be 11 below the deck and all steps should be level 5 Screw 2 2 1 2 screws nails into the ends of each ladde...

Страница 31: ...with slide Use Truss head screws included with Kit Fig 33 1 Truss Screw Use truss head screws to to secure slide to deck 11 1 4 washer 1 3 4 Panhead screw Deck Surface P Safety Handles 1 Mount safety handles in the ladder opening approximately 11 above the deck surface Fig 32 Fig 32 Meijer com ...

Страница 32: ...6 Crimp harness end closed CAUTION It is important that you crimp harness ends completely closed before using see Fig 36 Place end of harness with hooks on a hard surface and force hooks closed with a hammer or squeeze closed with a pliers until parts are touching WARNING Open hooks can cause deep cuts 3 Hang the chains from the nylon bushing swing hangers Crimp the hook opening closed with a plie...

Страница 33: ...the corners of your activity center at the bottom of the legs on swing sets and twist the auger style stakes into the ground until only the loop is exposed 3 Place the metal strap through the loop of the Anchor It stake and secure it to the unit with a lag screw and washer as illustrated to the right Note Attach the strap to the unit with as little play as possible using whatever holes in the stra...

Страница 34: ...rough the bottom of the 2 x 4 board to the top Insert the eye bolts of the Cargo Net through the holes of the top board and secure all of them using a beam clamp washer and loc nut see Fig 3 NOTE Using a hacksaw remove excess threads of the eyebolt as close to loc nut as possible 6 Place bolt covers over the bolts as indicated in Fig 3 Secure bolt covers using 2 screws nails 7 Place two rope stapl...

Страница 35: ...own in Fig 39b 3 Use a pencil to mark where you would like the Climbing Rocks to be installed Double check your spacing and secure Rock at each location Note Make sure the 2 x 4 supports do not interfere with the mounting of the climbing rocks 9 5 4 x 6 x 30 2 x 4 x 47 3 4 23 1 4 3 3 8 2 2 1 2 screws nails Per joint 2 x 4 x 47 3 4 Front Opening Option 2 see page 32 for Ladder Assembly Front Openin...

Страница 36: ... PlayCore Inc 2007 Printed In USA LA 5615 Questions Call our Customer Service Department at 1 800 888 1232 Meijer com ...

Отзывы: