24
Fig. 19a
J. Swing Beam Drill Locations
1.
Tap T-nut into 3/8’’ hole as shown in
(Fig. 19a)
Note:
If using Laminated Swing Beam, make sure t-nut teeth do not fall between seams of 2'' x 6''s.
2.
Place a bottom beam clamp over the swing hanger as shown in
(Fig. 19a)
3.
Insert the swing hanger into the beam and thread it into the T-nut until it is flush or near flush with the top of the
T-nut. A screwdriver may be used to twist the hanger
(Fig. 19a)
. Orient swing hanger as shown in
(Fig 19a)
.
4.
Use (4) 1-1/4'' screws/nails to secure beam clamp.
5.
Check hanger to ensure it does not spin.
6.
Repeat for all four hangers.
(4) 1-1/4'' screws
Swing Hanger
Use Screwdriver to aid in tightening
Bottom Beam Clamp
t-nut
Hammer
3/8'' hole
T-nut
or 1-1/2'' nails
Meijer.com