12
A. Frame Construction (cont.)
3.
Install upper 2'' x 4'' boards. Edges are to be flush
with 4'' x 4’’s.
Fig. 3
2'' x
4'' x
55''
2'' x
4'' x
55''
5/4'
' x 6
'' x
55''
5/4'
' x 6
'' x
55''
Frame
1
Frame 2
(3)
2-1/2'' screws/nails
(4)
2-1/2'' screws/nails
(1)
Lag Screw
(4)
2-1/2'' screws/nails
(1)
Lag Screw
(3)
2-1/2''
screws/
nails
2'' Lag screw
A. Frame Construction (cont.)
4.
Install lower 5/4'' boards. Edges are to be flush
with 4'' x 4’’s.
2-1/2'' or 10D
screw/nail
Meijer.com