background image

GB.FUNKMIRU.121204

Swegon reserves the right to alter specifications.

www.swegon.com     3

4. Communication

Physically install the GOLD air handling unit, MIRUVENT 
power roof ventilator and the MIRU Control equipment. 
See separate installation instructions.

4.1. MIRU Control and MIRUVENT power 
roof ventilator

Wiring the connections to MIRU Control

Connect the 3-wire cable to terminals 11 (A), 12 (B) and 
13 (GND) on the control circuit card inside the MIRU Con-
trol unit. See illustration. 

A twisted-pair cable is recommended. 

Wiring the connections to the MIRUVENT

MIRUVENT with AC motor and integrated frequency 
inverter

Unfasten and bend up the upper section of the frequency 
inverter. 

Place the upper section in the groove designed to receive 
it in the lower section. 

Connect the communication cable to terminals A, B and 
GND, next to the Bus marking. See illustration.  

MIRUVENT with EC motor and control system

Connect the communication cable to the wiring terminals 
inside the safety switch enclosure. 

Connect conductor A to terminal 4, conductor B to termi-
nal 5 and GND to terminal 6.

The internal electrical connections to the motor control 
system have already been wired. 

A B GND A B

-

-

-

GND

8 9 10 11 12 13 14 15 16 17 18 19 20 21

STOP

LS

HS

TEMP

INT.BUS(FAN)

TERM.ON OFF

Control circuit card, 
MIRU Control

A

}

(GND)

Control circuit card terminals, frequency inverter, MIRUVENT

B

Bus

L1

N

Aux NO

Aux NO

Aux NC

Aux NC

1

N

6

5
7

8

N

2

2

3

PE

5

6

4

A

GND

B

PE

Terminals in the safety switch enclosure, MIRUVENT

White - orange

Others

Orange

Содержание MIRU Control

Страница 1: ...l via Modbus 2 Material Specification Control of MIRUVENT fan via MIRU Control MIRU Control equipment TBMZ 11 MIRUVENT fan with type code MIRU x xx xx 3 0 or MIRU x xx xx 1 x x model and size codes Pr...

Страница 2: ...tions cable not included in supply 3 wire Twisted pair cables are recommended If shield is to be used the shield must be con nected to the AHUs roof fans chassi and not connected to MIRU Control not i...

Страница 3: ...requency inverter Place the upper section in the groove designed to receive it in the lower section Connect the communication cable to terminals A B and GND next to the Bus marking See illustration MI...

Страница 4: ...white tapping to pressure port on the pressure sensor Set the pressure sensor function selector switch to position 0 See illustration Connect the modular cable to an optional modular con nection in th...

Страница 5: ...e DIN rail inside the electrical cubicle of the GOLD unit or on another appropriate loca tion near this cubicle Connect the modular cable between one of the modular connections on the cable adapter an...

Страница 6: ...ld be set to the ON position See illustration If several MIRU Control units are connected to the same GOLD unit the MIRU Control that is last in the communi cation loop should have its jumper JP2 TERM...

Страница 7: ...y setting m s Fan regulation control MIRU Control is factory preset for pressure regulation Press reg sensor ON Pressure regulation requires connection of a pressure sensor set for pressure regulation...

Страница 8: ...see menu 2 10 MIRU Control unitsMax 10 units MIRU Control can be connected to one GOLD unit If two to ten MIRU Control units are connected to one GOLD unit the Modbus ID for each MIRU Control must be...

Страница 9: ...er to be able to start the fan Operating times via the Miru Control panel Set the current date and time under Time Date in the main menu Four different time channels can be set under Time chan nel If...

Страница 10: ...sed by the corresponding rate If EA is selected the extract airflow in the GOLD unit will be decreased by the corresponding rate Under Miru Control Time channel you must select the following for each...

Страница 11: ...ncy inverter 5 flashes Phase failure on supply voltage phase lacking 6 flashes Fluctuating supply voltage between phases 10 flashes Communication failure between upper and lower sections 11 flashes Me...

Страница 12: ...ng is correct the lower LED on the pressure sensor should be lit with a steady flow and the upper LED should be flashing No 4 PRESSURE SENSOR DEFECTIVE MIRU Control cannot establish correct communicat...

Отзывы: