background image

GB.FUNKMIRU.121204

Swegon reserves the right to alter specifications.

2     www.swegon.com

3. Basic Installation Diagram

MIRU Control

GOLD air handling unit (TBLZ-1-
64 connection kit is required)

MIRU Control equip-

ment

Power roof ventilator

MIRUVENT

Outdoor/room temperature sensor
TBLZ-1-25-2

Pressure sensor, flow

TBLZ-1-23-aa

(to be installed inside the 

MIRUVENT)

Pressure sensor, pressure regulation

TBLZ-1-23-aa

Supply voltage
1-phase, 3-wire, 230 V AC
(cable not included in supply)

Supply voltage

See MIRUVENT instructions

(cable not included in supply)

3-wire. Twisted pair cables are recommended.  

If shield is to be used, the shield must be con-
nected to the AHUs'/roof fans' chassi and not 

connected to MIRU Control

(not included in supply)

2-wire, min. permissible cross-sectional cable area: 0.5 
mm², max. 100 metres long (not included in supply)

3-wire. Twisted pair cables are recommended.  
If shield is to be used, the shield must be connected to the 
AHUs'/roof fans' chassi and not connected to MIRU Control
(not included in supply)

Modular cable (incl., 1-15 m long)

Modular cable (incl., 1-15 m long)

The cables to the MIRUVENT power roof ventilator 

should be appropriately run through the cable pro

-

tection (accessor

y) of the roof penetration collar

Содержание MIRU Control

Страница 1: ...l via Modbus 2 Material Specification Control of MIRUVENT fan via MIRU Control MIRU Control equipment TBMZ 11 MIRUVENT fan with type code MIRU x xx xx 3 0 or MIRU x xx xx 1 x x model and size codes Pr...

Страница 2: ...tions cable not included in supply 3 wire Twisted pair cables are recommended If shield is to be used the shield must be con nected to the AHUs roof fans chassi and not connected to MIRU Control not i...

Страница 3: ...requency inverter Place the upper section in the groove designed to receive it in the lower section Connect the communication cable to terminals A B and GND next to the Bus marking See illustration MI...

Страница 4: ...white tapping to pressure port on the pressure sensor Set the pressure sensor function selector switch to position 0 See illustration Connect the modular cable to an optional modular con nection in th...

Страница 5: ...e DIN rail inside the electrical cubicle of the GOLD unit or on another appropriate loca tion near this cubicle Connect the modular cable between one of the modular connections on the cable adapter an...

Страница 6: ...ld be set to the ON position See illustration If several MIRU Control units are connected to the same GOLD unit the MIRU Control that is last in the communi cation loop should have its jumper JP2 TERM...

Страница 7: ...y setting m s Fan regulation control MIRU Control is factory preset for pressure regulation Press reg sensor ON Pressure regulation requires connection of a pressure sensor set for pressure regulation...

Страница 8: ...see menu 2 10 MIRU Control unitsMax 10 units MIRU Control can be connected to one GOLD unit If two to ten MIRU Control units are connected to one GOLD unit the Modbus ID for each MIRU Control must be...

Страница 9: ...er to be able to start the fan Operating times via the Miru Control panel Set the current date and time under Time Date in the main menu Four different time channels can be set under Time chan nel If...

Страница 10: ...sed by the corresponding rate If EA is selected the extract airflow in the GOLD unit will be decreased by the corresponding rate Under Miru Control Time channel you must select the following for each...

Страница 11: ...ncy inverter 5 flashes Phase failure on supply voltage phase lacking 6 flashes Fluctuating supply voltage between phases 10 flashes Communication failure between upper and lower sections 11 flashes Me...

Страница 12: ...ng is correct the lower LED on the pressure sensor should be lit with a steady flow and the upper LED should be flashing No 4 PRESSURE SENSOR DEFECTIVE MIRU Control cannot establish correct communicat...

Отзывы: