![SVERO Smart Hoist 22 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/svero/smart-hoist-22/smart-hoist-22_manual_1410615004.webp)
Svero Lifting AB | Momarken 19, 556 50 Jönköping, Sweden
T:
+46 (0) 36 31 65 70
4
Mounting
It is a quick and simple operation to mount the Smart Hoist, that is provided in three
parts, on a beam. The parts are one side-plate with a hoisting unit fixed in a cover (Pos.
1), another side-plate with a cover (Pos. 2), and a suspension bolt (Pos. 3) with a holder
(Pos. 4), with an external guide wheel fixed in the middle of it
. At delivery the Smart
Hoist is prepared for a 120 mm beam.
Fig 2 Parts
Table 2 Parts
Pos. Description
1
Side-plate 1 with hoisting unit
2
Side-plate 2 with cover
3
Suspention bolt 500 kgs
4
Holder with external guide wheel
5
Wheel with ballbearing
Pos. 1
Pos. 2
Pos. 3
Pos. 5
Pos. 4