Svantek SV258 PRO Скачать руководство пользователя страница 3

 

 

SV 258 PRO User Manual 

IMPORTANT NOTES BEFORE USE 

 

Only SVAN 958A and the controller can be disconnected and removed from the station case by the user. 
All other disassembling work should be performed strictly by an authorized service team. 

 

The producer does not recommend removing the controller without a sound reason. Double check that 
the controller has a good fixation in the connector after reconnecting. 

 

Do not remove the battery from the case! This operation must be done only by the authorised service. 

 

SVAN  958A  is  powered  from  the  external  source  and  d

oesn’t  use  its  internal  batteries.  Internal 

instrument’s batteries must be removed for correct system operation and safety reasons. 

 

The correct connection of the accelerometer or microphone is not signalled by the controller therefore it 
is recommended to perform a test measurement each time the station is turned on. 

 

 

During  station  operation  it  is  recommended  to  charge  the  internal  and  external  batteries  as  often  as 
possible; this will extend battery life. It is necessary to charge the battery after any total discharge.

 

 

Monitoring station and/or SB 272 should not be stored for a long time with discharged batteries. Storing 
with batteries in discharged condition may damage them. 

 

If Monitoring station and/or SB 272 are planned to be stored for a long period of time, it is recommended 
to charge their batteries to 100% capacity. Batteries should be charged at least once per 6 months. 

 

If the storage period is longer than one year, a discharge/charge cycle must be performed. To do this, 
leave the device turned on until the battery is completely discharged. Then charge the battery to 100% 
capacity. 

 

Monitoring station and SB 272 have their own chargers, which are incompatible: SB 270 is a waterproof 
power supply for SV 258 PRO, whereas SB 273 is an indoor charger for SB 272. 

 

If you use the SV 208A sound measurements set, before installing the station at the measurement site, 
make  sure  that  the  protective  caps  on  the  four  anti-bird  spikes  of  the  SA 277  outdoor  microphone 
protection kit are removed. It is recommended to use the protective caps during transportation, storage 
and other operations with the instrument like, laboratory calibration, etc. to avoid personal injury. 

 

The windscreen influences the free-field characteristics of the SA 277 outdoor microphone protection kit; 
therefore,  it  is  important  to check  its  condition  regularly. In the  case  of  visible  degradation  of  the foam 
surface it must be replaced by the new one. 

 

If you use desiccator (silica gel) inside the outdoor microphone protection, it should be regenerated after 
some period of use, when it changes colour to light grey, by drying it for 3 hours in a temperature of 150°C. 
Desiccator should be inspected at least every two weeks, and more often when used in conditions of high 
air humidity. 

 

 

 
 

 

Содержание SV258 PRO

Страница 1: ...USER MANUAL Warsaw 2021 05 15 Rev 2 00 Copyright 2021 SVANTEK All rights reserved SV 258 PRO BUILDING VIBRATION NOISE MONITORING STATION...

Страница 2: ...s prohibited Trademarks Trademarks or registered marks in this manual belong to their respective manufacturers Microsoft and Windows are registered trademarks of Microsoft Corporation Disclaimer Infor...

Страница 3: ...a long period of time it is recommended to charge their batteries to 100 capacity Batteries should be charged at least once per 6 months If the storage period is longer than one year a discharge char...

Страница 4: ...g Ground Vibration Accelerometer 15 2 1 3 External Power Supply with AC DC converter 16 2 2 Optional accessories for SV 258 PRO 16 2 2 1 Sound Measurement Set 16 2 2 2 Vibration Calibrator 17 2 2 3 So...

Страница 5: ...mail alarming 29 4 2 3 SMS command exchange 29 4 3 Remote Communication module of SvanPC 29 5 SVANNET USER INTERFACE 30 5 1 Station list view 30 5 1 1 STATUS view 32 5 1 2 LOG views 34 5 2 WEB INTERFA...

Страница 6: ...mware versions of SVAN 958A The basic firmware of SVAN 958A is dedicated for general four channel measurements and the user may configure all channels independently This firmware is supplied as a stan...

Страница 7: ...ing system SC 278 Cable for SV 84 and SV 258 SA 251 Carrying case for SV 207B SB 270 and accessories to SV 258 1 3 ACCESSORIES AVAILABLE SV 208A Sound measurements set Microtech Gefell Prepolarised co...

Страница 8: ...harging unit and connectors 1 controller 2 SVAN 958A Class 1 Vibration Sound Level Meter and Analyser 3 mobile modem 4 low noise hermetically sealed tri axial piezoelectric accelerometer enables an ou...

Страница 9: ...ble battery connectors cables circuit boards SVAN 958A can be removed from the case by the user and used as a hand held vibration and sound meter To do this the user should 1 switch off SVAN 958A by p...

Страница 10: ...ealed against moisture The station case is equipped with four Souriau UTO type connectors for input signals from the tri axial piezoelectric accelerometer INPUT 1 3 input signal from the microphone IN...

Страница 11: ...ecessary to charge the battery after any total discharge Note The station should not be stored for a long time with a discharged battery Storing with batteries in discharged condition may damage them...

Страница 12: ...es are available on http svantek com support drivers software html Note Make sure SvanPC is Off before starting the update If not please Exit it before starting any upgrading To upgrade the SD 270 PRO...

Страница 13: ...d alarm functions SVAN 958A has two input sockets 4 pins Lemo compatible socket type ENB 0B 304 for Channels 1 3 and TNC for Channel 4 All sockets ensure IEPE power supply for the accelerometers or mi...

Страница 14: ...r measurement of the vibration imission in accordance with DIN 45669 2 and optionally to monitor noise you must assure additional settings 1 The measurement function should be set to Ground Vibrations...

Страница 15: ...menu are correct then once you insert a SIM card in the modem slot the remote communication settings of the modem are automatically adjusted to connect to the SvanNET server In some cases APN should...

Страница 16: ...lightweight materials and is easy to install on a tripod The outdoor microphone kit has screw on its bottom which enables using of standard tripods or other user specific mountings Technical data suc...

Страница 17: ...prior to and following a measurement or series of measurements The SV 111 is suitable for calibration checks of various of vibration transducer types at different frequencies from 16 Hz up to 640 Hz D...

Страница 18: ...1 189 IMDG amendment 27 Note It is necessary to charge SB 272 after any total discharge otherwise the battery may lose its capacity Note SB 272 should not be stored for a long time with a discharged b...

Страница 19: ...s of type WERMA LED Buzzer 12 V DC The alarm lamp is connecting to the EXTERNAL INTERFACE connector In this lamp the buzzer is disabled by default To enable it 1 open the case by pushing the black but...

Страница 20: ...d that the batteries of SV 258 PRO and SB 272 are charged before going on site Note The monitoring station and the external battery have their own chargers which are incompatible SB 270 is a waterproo...

Страница 21: ...red for example when SVAN 958A is switched off When there is data transmission between the controller and SVAN 958A the green LED will be blinking During connection initialization or powering down pha...

Страница 22: ...stops changing colours and turns green status of the internal battery charging indicated by green orange red BAT 1 If the case lid is closed all LEDs will be off but charging will continue 3 3 3 Boots...

Страница 23: ...APN In this case the APN must be entered manually either using the SvanPC software or the SVAN 958A user interface path Menu Setup Wireless Com Modem Connection APN Note The station is supplied with...

Страница 24: ...able start by lining up the key on the plug and the socket then lock the connector by turning the ring clockwise only the ring close to the socket will rotate To disconnect cables push the connector t...

Страница 25: ...ncludes checking connections with the instrument and the mobile modem Additionally system power internal temperature of the station and the battery state are checked During the test procedure the cont...

Страница 26: ...llows usage of all type of SIM cards with the station mobile modem regardless of having a public or private IP The connection over the SvanNET allows users to watch real time measurement results to co...

Страница 27: ...m panel login php Before logging select your language Once logged in you can use the web interface to work remotely with the monitoring station Note Ask your local SVANTEK distributer to create the Sv...

Страница 28: ...RO uses the TCP Client mode for connection with SvanNET this is the default setting of SVAN 958A The user PC connects to SvanNET via a web browser or SvanPC and the service creates a bridge between th...

Страница 29: ...configured to enable e mail sending via SvanNET The user can reconfigure it through SvanPC only see SvanPC User Manual SV 258 PRO stations support SSL Secure Socket Layer connections to e mail servers...

Страница 30: ...is manual describes only the Station list tools To get more information about Project list see SvanNET User Manual 5 1 STATION LIST VIEW Station list displays all stations assigned to your account tur...

Страница 31: ...on the appropriate button it will change its colour to blue and click it The WEB INTERFACE button switches you to the Live data view see Chapter 5 2 in which you can view measurement results and use a...

Страница 32: ...nd in the EDIT CONDITIONS pop up box a select Status source Mains External voltage Battery charge Storage memory System check etc b click the Trigger value selector and choose the required value of th...

Страница 33: ...action Restart measurement Instrument clock is incorrect o Trigger value xx seconds xx minutes alarm is generated if the RTC indication of the device is inconsistent with the current system time base...

Страница 34: ...in the ACTIONS and MEASUREMENT POINTS areas 5 1 2 LOG views There are three station logs that register system events connections and data transfer Status log which registers power source type and char...

Страница 35: ...wnloading files and measurements start stop The VIEW button switches you to the Live data view see Chapter 5 2 1 in which you can view broadband results and 1 1 or 1 3 octave spectra The STATUS button...

Страница 36: ...our selector buttons for the Instantaneous results and four buttons for the Summary results To change the displayed result click the selector button for the required Channel and choose the result Note...

Страница 37: ...TUP saving measurement results STORAGE triggering alarms based on events EVENT TRIGGER triggering measurements MEASUREMENT TRIGGER and functionality of the external I O port EXTERNAL I O To send new c...

Страница 38: ...the Summary results in a file measurement time and step of saving Integration period number of measurement repetitions Repetition cycles and switch on off saving of statistical results Save statistic...

Страница 39: ...ased by one each time the new file is created In the EVENT TRIGGER tab you can 1 configure events for triggering markers audio recording and alarms in the Alarm triggers section 2 enable trigger of ti...

Страница 40: ...hreshold condition can be of Level Level Slope Slope Gradient or Gradient type Mode The condition is fulfilled during the period in which the controlled value of the selected result Source will be hig...

Страница 41: ...ition Mode Level Level Slope Slope Gradient or Gradient the trigger will be switched on To start mask creation click the field select the spectrum frequency or the Total result and click confirm or ca...

Страница 42: ...on you wish to add and configure Logger Alarm flag SMS alarm or E mail alarm After occurrence of the event actions will be performed during the time the event is active at its beginning or at the end...

Страница 43: ...MEASUREMENT TRIGGER tab you can set 1 trigger Mode Off Slope Slope Level Level Gradient RTC 2 Source of the triggering condition Vector Vec sound RMS P1 Ext trigger 3 Channel of the source 1 2 3 or 4...

Страница 44: ...I O port In the case of Digital in mode the I O port is working as External trigger Function In the case of Digital out mode you should select Function whether the I O port is working as an Alarm puls...

Страница 45: ...memory card and it initially shows the content of the current working directory In the Storage window you can 1 Download or delete individual files by clicking the righthand icons on the file line 2...

Страница 46: ...torage temperature range SM 258 PRO and SA 250 40 C to 70 C 6 Working relative humidity range 0 100 RH Power Supply 7 Internal battery Europower EP 17 12 12 V 17 Ah 8 SV 258 PRO power consumption with...

Страница 47: ...t Line 16 SVAN 958A Meter analyser Manual and data specification are available at http www svantek com 17 SV 84 accelerometer Triaxial accelerometer with sensitivity1000 mV g Specification is availabl...

Страница 48: ...s R TTE GCF CE FCC PTCRB IC UL AT T and other local approvals and provider Certifications EHS6 T only 4G modem 23 modem type and features Cinterion PLS62T W Gateway LTE 1 2 3 4 5 7 8 12 17 18 19 20 28...

Страница 49: ...l www svantek com 2 SvanNET User Manual www svantek com 3 SvanPC User Manual www svantek com 4 SV 84 Specification www svantek com 5 GeMalto EHS6 Terminal User Manual www gemalto com 6 Cinterion PLS62...

Отзывы: