6-18 ELECTRICAL SYSTEM
GENERATOR REASSEMBLY AND
REMOUNTING
Reassemble and remount the generator in the reverse order of
removal and disassembly. Pay attention to the following points:
#
• Apply SUZUKI SUPER GREASE “A” to the lip of the oil seal.
.
99000-25010: SUZUKI SUPER GREASE “A”
• Apply a small quantity of THREAD LOCK “1342” to the bear-
ing retainer screws and tighten them to the specified torque.
/
99000-32050: THREAD LOCK “1342”
(
Bearing retainer screw: 2.5 N·m (0.25 kgf-m)
• Install the bearing and rotor using a hand-press.
1
Hand-press
2
Jig
3
Rotor
4
Bearing
5
Bearing cover #1
6
Bearing cover #2
7
Expander ring
The removed oil seal should be replaced with a new one.
Содержание GSF650
Страница 1: ...GSF650 S...
Страница 34: ...PERIODIC MAINTENANCE 2 21...
Страница 86: ...3 50 ENGINE Remove the 2nd driven gear bushing A Remove the oil seal B...
Страница 90: ...3 54 ENGINE...
Страница 103: ...ENGINE 3 67 BOND 1207B should be applied to the following locations The line of BOND...
Страница 130: ...3 94 ENGINE ENGINE LUBRICATION SYSTEM...
Страница 132: ...3 96 ENGINE CYLINDER HEAD COOLING SYSTEM...
Страница 145: ...4 10 FUEL SYSTEM I D NO LOCATION Each carburetor has an I D number 1 printed on its body...
Страница 317: ...SERVICING INFORMATION 7 29 BATTERY PROTECTOR INSTALLATION Protector Protector Battery Protector 50 mm 50 mm...
Страница 332: ...Prepared by November 2004 Part No 99500 36150 01E Printed in Japan 340...
Страница 333: ...Printed in Japan K5...