5-72 CHASSIS
• Apply grease on the recessed portion of the joint plate holder
3
and set the joint plate
0
.
NOTE:
When positioning the joint plate
0
on the tool, its stamp mark
must face the joint plate holder
3
side.
• Set the drive chain on the tool as illustrated and turn in the
adjuster bolt
5
to secure the wedge holder & wedge pin
4
.
• Turn in the pressure bolt “A”
6
and align two joint pins
A
properly with the respective holes of the joint plate
0
.
• Turn in the pressure bolt “A”
6
further using the bar
7
to
press the joint plate over the joint pins.
• Continue pressing the joint plate until the distance between
the two joint plates come to the specification.
&
Joint plate distance specification
W
$
JOINT PIN STAKING
• Set up the special tool as shown in the illustration.
1
Tool body
2
Grip handle
3
Pressure bolt “A”
4
Adjuster bolt (without hole)
5
Staking pin (stowed inside grip handle behind rubber cap)
6
Bar
NOTE:
Before staking the joint pin, apply a small quantity of grease to
the staking pin
5
.
RK
20.45 – 20.75 mm
Should pressing of the joint plate be made excessively
beyond the specified dimension, the work should be
redone using the new joint parts.
Содержание GSF650
Страница 1: ...GSF650 S...
Страница 34: ...PERIODIC MAINTENANCE 2 21...
Страница 86: ...3 50 ENGINE Remove the 2nd driven gear bushing A Remove the oil seal B...
Страница 90: ...3 54 ENGINE...
Страница 103: ...ENGINE 3 67 BOND 1207B should be applied to the following locations The line of BOND...
Страница 130: ...3 94 ENGINE ENGINE LUBRICATION SYSTEM...
Страница 132: ...3 96 ENGINE CYLINDER HEAD COOLING SYSTEM...
Страница 145: ...4 10 FUEL SYSTEM I D NO LOCATION Each carburetor has an I D number 1 printed on its body...
Страница 317: ...SERVICING INFORMATION 7 29 BATTERY PROTECTOR INSTALLATION Protector Protector Battery Protector 50 mm 50 mm...
Страница 332: ...Prepared by November 2004 Part No 99500 36150 01E Printed in Japan 340...
Страница 333: ...Printed in Japan K5...