![Suzuki 9 Скачать руководство пользователя страница 85](http://html.mh-extra.com/html/suzuki/9/9_service-manual_1408853085.webp)
3-38 IGNITION AND ELECTRICAL
ASSEMBLY
Assembly is reverse order of disassembly with special attention
to the following steps.
When installing pinion shift lever, refer to figure in construction
diagram for installation direction.
When installing armature, use care to avoid breaking
brushes.
7 N.m
(0.7 kg-m,
5.1 lb-ft)
5.5 N.m
(0.55 kg-m, 4.0 lb-ft)
1
Nut
2
Bolt
3
Magnetic switch
4
Gasket
5
Spring
6
Plunger
7
Torsion spring
8
Rubber packing
9
Shift lever
0
Front housing
A
Screw
B
Through bolt
C
Rear cover
D
Thrust washer
E
Brush holder
F
Yoke
G
Armature
H
Center cover plate
I
Internal gear
J
Planetary gear
K
Pinion shaft
L
Pinion
M
E-ring
N
Washer
O
Center bracket
P
Rubber ring
Q
Stopper ring
R
Pinion stopper
Construction diagram
Содержание 9
Страница 1: ...For 2005 model 9 9 5 0 0 9 4 J 0 1 0 1 E ...
Страница 292: ...Prepared by Service Department 1st Ed July 2004 2nd Ed January 2008 Manual No 99500 94J01 01E Printed in Japan 296 ...
Страница 293: ......
Страница 314: ...20 DF9 9T TH DF15 Serial No 110001 and later SPECIAL TOOLS 09915 63311 Compression gauge adaptor ...
Страница 319: ...Prepared by Outboard Motor Engineering Department September 2010 Manual No 99501 94J20 01E Printed in Japan 24 ...
Страница 320: ......