![Suzuki 9 Скачать руководство пользователя страница 270](http://html.mh-extra.com/html/suzuki/9/9_service-manual_1408853270.webp)
DF9.9T/TH “K8” (’08) MODEL 12-21
INSTALLATION
Installation is reverse of removal with special attention to follow-
ing steps.
• Ensure that the drive joint
1
is aligned and firmly inserted into
the gear pump assembly.
• Fit O-ring
2
to PT motor.
• Check the level of PT fluid contained in the PT pump case. If
level is low, add recommended PT fluid until level with mating
surface of PT motor.
• Ensure that the faces of the PT motor and pump unit are free
of dirt or debris.
When attaching the PT motor to the PT pump case, ensure
that the tip of armature shaft
3
fits firmly into the drive joint
1
.
• Tighten the two (2) bolts to specified torque.
PT motor bolt: 5 N·m (0.5 kg-m, 3.6 lb-ft)
• Fix the PT motor cable with clamp
4
.
Содержание 9
Страница 1: ...For 2005 model 9 9 5 0 0 9 4 J 0 1 0 1 E ...
Страница 292: ...Prepared by Service Department 1st Ed July 2004 2nd Ed January 2008 Manual No 99500 94J01 01E Printed in Japan 296 ...
Страница 293: ......
Страница 314: ...20 DF9 9T TH DF15 Serial No 110001 and later SPECIAL TOOLS 09915 63311 Compression gauge adaptor ...
Страница 319: ...Prepared by Outboard Motor Engineering Department September 2010 Manual No 99501 94J20 01E Printed in Japan 24 ...
Страница 320: ......