![Suzuki 9 Скачать руководство пользователя страница 272](http://html.mh-extra.com/html/suzuki/9/9_service-manual_1408853272.webp)
DF9.9T/TH “K8” (’08) MODEL 12-23
INSTALLATION
Installation is reverse order of removal with special attention to
the following steps.
Lower tilt rod to full down position.
09945-79310: PT cable extension
Apply Water Resistant Grease to the tilt cylinder lower shaft and
lower shaft bushes.
Install bushes
1
and tilt cylinder lower shaft
2
to PT unit.
99000-25161: SUZUKI WATER RESISTANT GREASE
Place the PT unit in position between the clamp brackets.
Tighten the clamp bracket shaft nut
3
to specified torque.
Clamp bracket shaft nut: 43 N·m (4.3 kg-m , 31.0 lb-ft)
NOTE:
After tightening clamp bracket shaft nut with specific torque,
bend lock washer edge
a
toward nut for locking.
Содержание 9
Страница 1: ...For 2005 model 9 9 5 0 0 9 4 J 0 1 0 1 E ...
Страница 292: ...Prepared by Service Department 1st Ed July 2004 2nd Ed January 2008 Manual No 99500 94J01 01E Printed in Japan 296 ...
Страница 293: ......
Страница 314: ...20 DF9 9T TH DF15 Serial No 110001 and later SPECIAL TOOLS 09915 63311 Compression gauge adaptor ...
Страница 319: ...Prepared by Outboard Motor Engineering Department September 2010 Manual No 99501 94J20 01E Printed in Japan 24 ...
Страница 320: ......