Charging System: 1J-6
Generator Removal and Installation
B649G11A06003
Refer to “Electrical Components Location: in Section
0A”.
Removal
1) Disconnect the battery (–) lead wire. Refer to
“Battery Removal and Installation: ”.
2) Disengage the gearshift lever link by removing bolt.
3) Remove the engine sprocket cover (1).
4) Disconnect the generator lead wire (2) and coupler
(3).
5) Remove the generator (4).
Installation
Installation is in the reverse order of removal.
Pay attention to the following points:
• Tighten the generator mounting bolts to the specified
torque.
Tightening torque
Generator mounting bolt (a): 25 N·m (2.5 kgf-m,
18.0 lb-ft)
• Route the wire harness properly. Refer to “Wiring
Harness Routing Diagram: in Section 9A”.
• Before installing the engine sprocket cover, apply a
small quantity of SUZUKI SUPER GREASE “A” to the
clutch push rod.
: Grease 99000–25010 (SUZUKI SUPER
GREASE A or equivalent)
• Install the gearshift lever to the gearshift shaft in the
correct position.
Gearshift lever height “a”
Standard: 55 mm (2.2 in)
1
I649G11A0005-02
2
3
4
I649G11A0006-02
(a)
(a)
I649G11A0007-01
I649G11A0008-02
“ a ”
I649G11A0009-02
Содержание 1200 bandit
Страница 1: ...9 9 5 0 0 3 9 2 8 0 0 1 E GSF1200 GSF1200S ...
Страница 4: ......
Страница 89: ...Engine Mechanical 1D 21 B I649G1140073 02 C I649G1140074 02 24th pin 1st pin I649G1140075 03 ...
Страница 288: ...2D 20 Wheels and Tires ...
Страница 446: ...Prepared by December 2005 Part No 99500 39280 01E Printed in Japan 448 ...
Страница 447: ...Printed in Japan K6 ...