03/01/16
670- 00017B
14
7.4 Hydraulic Tubing Management
•
Coil up excess hydraulic flexible tubing into approximately 6 in. (150mm)
diameter coil(s) and attach to the workstation using the mounting clips and/or
cable ties. Take special care not to damage flexible tubing during this operation.
•
While it is recommended to coil up excess tubing when hydraulic tubing lengths
are too long, the lines can be shortened. Contact Suspa
®
Incorporated for detailed
Movotec
®
Tube Shortening Instructions.
•
If hydraulic tubing lengths are too short, it is only possible to make the tubing
lengths longer by replacing the line, using a Movotec
®
Refill Kit (part number
D99-00010 available at
https://shop.suspa.com/storefront.aspx
). Contact Suspa
®
Incorporated for a more information and instructions.
•
Check flexible tubing to ensure it is secured to the workstation and that no
damage has been sustained during this operation.
7.5 Workstation Leveling
•
Thread glides into all lift cylinders until the glide threads are fully engaged as
shown. This step will provide a good starting point for leveling the workstation.