03/01/16
670- 00017B
11
•
Mount the crank driven pump to the work-surface. Please note that mounting
screws are not provided with system.
•
Check mounting screws to ensure that the unit is tightly secured.
7.3 Lift Cylinder Installation
•
Unwrap lift cylinders and drilling templates from bubble wrapping. Dispose of
bubble wrapping material in an ecologically sound manner.
•
Thoroughly clean all workstation leg mounting surfaces to ensure the cylinder
drilling templates will adhere. Apply the drilling templates parallel to the
workstation leg surfaces, making sure that the templates are oriented correctly.