Sureshot Dispensing Systems AC2-GP Скачать руководство пользователя страница 5

AC2-GP Multi-Sweetener Dispenser 

 SureShot Technical Assistance Center: 1-888-777-9990 or 902-865-9602 

 

AC2-GP 

Dispenser may not be exactly as shown 

 

 

 

MULTI-SWEETENER DISPENSER 

OPERATIONS MANUAL 

 

Important: Read this Manual now and retain it for future reference 

 
THE DISPENSER 

The  SureShot  Dispensing  Systems®  AC2-GP  Multi-Sweetener  Dispenser  automatically 
dispenses  controlled  portions  of  two  dry  products  such  as  sugar  and  other  alternative 
products for use in coffee, milkshakes, hot chocolate, health drinks and other beverages. 
The product is dispensed by touching selection buttons on the front of the dispenser. 
 
The dispenser has been preconfigured to industry-standard defaults. Each button press 
is pre-set independently to accurately dispense a specified amount of product using our 
unique, state-of-the-art microprocessor technology. The products to dispense are 
contained in product hoppers inside the dispenser. The auger style dispense system is 
designed to work with dry products with similar consistency to sugar granules. 
 
 

MAIN COMPONENTS 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Program / Maintenance Mode Buttons 

  Program / Maintenance Mode 

  Adjustment Up 

 

Adjustment Down 

  Panel Disable 

LCD Display 
Window 

Button Panel 

Infrared 
Programming 
Window 

Program / Maintenance 
Mode Buttons 

Catch Tray and 
Screen 

Cup Guide 
(optional) 

Dispenser Top 

Transition Piece 

SPECIFICATIONS 

Weight:

 

29.0 lbs/13.2 kg 

 

(empty dispenser)

 

Dimensions (LxWxH):  17.75" x 4.0" x 24" 
 

(without feet) 

Dispenser height 
varies with feet 
selection 

 
Hopper Capacity: 

Top Hopper 

 

6.0 lbs/2.7 kg 

 

(granular sugar)

 

 

 

 

Bottom Hopper 

 

2.5 lbs/1.1 kg 

 

(granular sugar) 

Hoppers are made of food-grade plastic. 

Positionable 
Feet 

Содержание AC2-GP

Страница 1: ...AC2 GP Multi Sweetener Dispenser Operations Manual D 19 090RevL...

Страница 2: ......

Страница 3: ...enser 2 DISPENSER REQUIREMENTS 3 Safety Precautions 3 Electrical 3 Locating the Dispenser in Your Facility 3 Repositioning Feet Optional 4 CLEANING 5 Recommended Cleaning Schedule 5 Exterior 5 Button...

Страница 4: ......

Страница 5: ...ndependently to accurately dispense a specified amount of product using our unique state of the art microprocessor technology The products to dispense are contained in product hoppers inside the dispe...

Страница 6: ...mages within 24 hours Your immediate inspection and reporting protects you against loss Notify SureShot Dispensing Systems within 24 hours of any damage claims No returns will be accepted without prio...

Страница 7: ...pin Note older dispensers have an in line external power supply which attaches to the back of the unit using a screw type locking connector This type of power supply must be kept away from water The...

Страница 8: ...repositioned to provide clearance for adjacent appliances 1 Determine which feet need repositioning 2 Remove the two 2 screws securing the foot to be moved Retain the screws 3 Move the foot to the nex...

Страница 9: ...e 6 Every week Inside Compartment See page 6 Dispense Tube See page 6 Product Hoppers and Augers See page 7 Exterior 1 Wipe exterior surfaces using a soft cloth dampened with warm clean soapy water A...

Страница 10: ...a dishwasher is available the items may be cleaned on the full wash cycle 5 Rinse well with warm clean water 6 Air dry thoroughly 7 Reinstall the top and transition piece on the dispenser Inside Comp...

Страница 11: ...s of the auger tip together and push into front bushing Option 2 i Hold hopper so that the exposed tip of the auger at the front of the hopper is on the corner of a countertop ii Push down firmly unti...

Страница 12: ...e rear bushing with mating flat surface on the top of the opening Note on older hoppers the notch on the back bushing must be aligned with the pin at the top of the opening e Press firmly on back bush...

Страница 13: ...t using a screw type locking connector This type of power supply must be kept away from water and may have been supplied with industrial Velcro for attachment onto the rear of the dispenser Language S...

Страница 14: ...s heard Note Button panel will enable automatically after 3 minutes of being disabled Opening the Dispenser Door 1 Grasp door on the top right corner and swing out until the door is opened fully 180 T...

Страница 15: ...dispenser door a Grasp door on the top right corner and swing out until the door is opened fully 180 3 Load hopper into the appropriate product compartment Large hopper Top compartment for higher vol...

Страница 16: ...ways filled above the low level line Do not overfill to prevent spillage of product 3 Replace top on the dispenser Important To maintain portioning accuracy always keep product filled above the low le...

Страница 17: ...4 Allow product to flow into cup 5 Remove cup 6 Fill cup with desired beverage STANDARD BUTTON PANEL LAYOUT Program Maintenance Modes Allows authorized personnel access to settings within the program...

Страница 18: ...pensed product Language Changes the language displayed in the LCD display window Service Used by authorized personnel for servicing the dispenser P1S1 P2S1 etc Product and Size Selected If these messa...

Страница 19: ...2 Select any Amount button for product to be adjusted 3 Press the Adjustment Up or Adjustment Down button to desired percentage change 4 To exit Maintenance Mode press and hold the Program Mode button...

Страница 20: ...Product 2 Select any amount button for the appropriate product hopper 3 Press the Adjustment Up or Adjustment Down button repeatedly until desired product is displayed 4 To exit Program Mode press and...

Страница 21: ...steps followed 2 Aim the FOB at the infrared window red rectangle below the selection buttons see Figure 2 then press and release the activation button on the FOB When aimed correctly the left LED on...

Страница 22: ...n the hopper 4 Ensure the dispense tube is clear of any blockages 5 Ensure the hopper is properly inserted into the dispenser Check that the side locking tabs on hopper are locked into the slots along...

Страница 23: ...tment a Hold the hopper straight Place the back of the hopper on rails inside the dispenser b Slide the hopper straight in all the way until the side locking tabs on hopper are locked into the slots a...

Страница 24: ...AC2 GP Multi Sweetener Dispenser SureShot Technical Assistance Center 1 888 777 9990 or 902 865 9602 20 WIRING DIAGRAM...

Страница 25: ...AC2 GP Multi Sweetener Dispenser SureShot Technical Assistance Center 1 888 777 9990 or 902 865 9602 21...

Страница 26: ...AC2 GP Multi Sweetener Dispenser SureShot Technical Assistance Center 1 888 777 9990 or 902 865 9602 22...

Страница 27: ...day WARRANTY PROCEDURE 1 Secure the Serial Number Model Number and Option Code from the data label located on the outside of the equipment 2 Call the number provided on the service label on the dispe...

Страница 28: ...penser SureShot Technical Assistance Center 1 888 777 9990 or 902 865 9602 A C Dispensing Equipment Inc 100 Dispensing Way Lower Sackville Nova Scotia Canada B4C 4H2 1 888 777 9990 or 1 902 865 9602 w...

Отзывы: