OPERATING TEMPERATURE MIN-MAX: 2-4
3
°C / 3
9
-1
09
°F
-
do not install the appliance in an environment where high ambient temperatures (e.g. unvented boiler house)
or freezing temperatures can occur.
-
the appliance cannot be exposed to outdoor elements, such as direct sunlight or atmospheric precipitation.
-
do not install the appliance too close to a water heater; keep at least 3 m (10 ft) of piping between
the outlet of the appliance and the inlet of the water heater; water heaters can sometimes transmit
heat back down the cold pipe into the appliance; always install a check valve at the outlet of the appliance.
ELECTRICAL CONNECTION
: 230V-50Hz
-
the appliance only works on
12
V
AC; always use it in combination with the supplied transformer
230/12V-50Hz
.
-
make sure to plug the transformer into a power outlet, which is installed in a dry location, with the proper
rating and over-current protection.
OPERATING CONDITIONS
AND
REQUIREMENTS
PREPARATION OF THE SYSTEM FOR INSTALLATION
4
- Before installing the appliance, in the first place you should
prepare the system for installation. To do so, please follow the
steps described below.
IMPORTANT INFORMATION
Step 1. Unscrew the head from the cylinder.
NOTE! The
distribution pipe should be embedded inside the
cylinder.
Step 3. Fill in the cylinder with quartz substrate so that it is
placed evenly on the cylinder bottom and it covers
completely the lower distributor.
NOTE! To make the cylinder filling easier, please use a
funnel.
Step 2. Cover the distribution pipe with an end cap.
NOTE! If quartz or bed gets inside the distribution pipe, it
can damage the control valve during the appliance
operation.
Step 4. Fill in the cylinder with the proper bed.
Step 5. Screw up the control valve on the cylinder.
NOTE! Earlier take off the end cap from the distribution
pipe.
Содержание OXYLINE
Страница 1: ...Installation Manual www pavirani com...