2-4
S
UPER
S
ERVER AS-4021GA-62R+F User's Manual
Rack Precautions
Ensure that the leveling jacks on the bottom of the rack are fully extended to
•
the fl oor with the full weight of the rack resting on them.
In single rack installation, stabilizers should be attached to the rack.
•
In multiple rack installations, the racks should be coupled together.
•
Always make sure the rack is stable before extending a component from the
•
rack.
You should extend only one component at a time - extending two or more si-
•
multaneously may cause the rack to become unstable.
General Server Precautions
Review the electrical and general safety precautions that came with the com-
•
ponents you are adding to your chassis.
Determine the placement of each component in the rack
•
before
you install the
rails.
Install the heaviest server components on the bottom of the rack fi rst, and then
•
work up.
Use a regulating uninterruptible power supply (UPS) to protect the server from
•
power surges, voltage spikes and to keep your system operating in case of a
power failure.
Allow the hot plug hard drives and power supply modules to cool before touch-
•
ing them.
Always keep the rack's front door and all panels and components on the servers
•
closed when not servicing to maintain proper cooling.
Warnings and Precautions!
!
!
Содержание SUPERSERVER AS-4021GA-62R+F
Страница 1: ...SUPER SUPERSERVER AS 4021GA 62R F USER S MANUAL Revision 1 0a...
Страница 5: ...v Preface Notes...
Страница 10: ...Notes SUPERSERVER AS 4021GA 62R F User s Manual...
Страница 74: ...5 38 SUPERSERVER AS 4021GA 62R F User s Manual Notes...
Страница 90: ...6 16 SUPERSERVER AS 4021GA 62R F User s Manual Notes...
Страница 108: ...7 18 SUPERSERVER AS 4021GA 62R F User s Manual Notes...
Страница 110: ...A 2 SUPERSERVER AS 4021GA 62R F User s Manual Notes...