![Supero SuperServer 6123L-8R Скачать руководство пользователя страница 70](http://html1.mh-extra.com/html/supero/superserver-6123l-8r/superserver-6123l-8r_user-manual_1405747070.webp)
Chapter 6: Advanced Chassis Setup
6-7
IDE Drive Installation (6123L-iR only)
1.
Installing/removing IDE drives
The IDE drive bays are located in the front of the chassis, making them
easily accessible for installation and removal. The IDE drives are not hot-
swap units, meaning system power must be turned off before installing and/or
removing them. To install or remove a drive, first power down the system.
Unscrew the retention screw at the top center of the drive, then push the
drive carrier out from the back until you can grasp and pull it out through the
front of the chassis (see Figure 6-5). Reverse this procedure when installing
a drive carrier, making sure you screw in the retention screw. Replace the
top cover when finished.
2.
Mounting an IDE drive in a drive carrier
Like SCSI drives, IDE drives are also mounted in drive carriers to simplify
their installation and removal from the chassis. These carriers also help
promote proper airflow. For this reason, even empty carriers without IDE
drives installed must remain in the chassis. To add a new IDE drive, install a
drive into the carrier with the printed circuit board side toward the carrier so
that the mounting holes align with those in the carrier. Secure the drive to
the carrier with the four screws (see Figure 6-6).
Figure 6-5. Removing an IDE Drive Carrier from the Chassis
Содержание SuperServer 6123L-8R
Страница 1: ... SUPERSERVER 6123L 8R SUPERSERVER 6123L iR USER SMANUAL 1 0 SUPER RESET NIC 1 NIC 2 RESET NIC 1 NIC 2 ...
Страница 5: ...v Preface Notes ...
Страница 10: ...SUPERSERVER 6123L 8R 6123L iR User s Manual x Notes ...
Страница 18: ...SUPERSERVER 6123L 8R 6123L iR User s Manual 1 8 Notes ...
Страница 23: ...2 5 Chapter 2 Server Installation Figure 2 3 Installing the Outer Rack Rails ...
Страница 73: ...6 10 SUPERSERVER 6123L 8R 6123L iR User s Manual Notes ...