2-6
SUPERSERVER 6027R-N3RF/WRF USER'S MANUAL
Outer Rack Rails
Outer rails attach to the rack and hold the chassis in place. The outer rails for the
SC825 chassis extend between 30 inches and 33 inches.
Installing the Outer Rails to the Rack (Figure 2-2)
1. Secure the back end of the outer rail to the rack, using the screws provided.
2. Press the button where the two outer rails are joined to retract the smaller
outer rail.
3. Hang the hooks of the rails onto the rack holes and if desired, use screws to
secure the front of the outer rail onto the rack.
4. Repeat steps 1-3 for the remaining outer rail.
Figure 2-2. Assembling the Outer Rails
Installing the Chassis into a Rack (Figure 2-3)
Warning:
Do not pick up the server with the front handles. They are
designed to pull the system from a rack only.
Stability Hazard:
The rack stabilizing mechanism must be in place, or the
rack must be bolted to the fl oor before you slide the unit out for servicing. Failure
to stabilize the rack can cause the rack to tip over.
1. Extend the outer rails as illustrated above.
2. Align the inner rails of the chassis with the outer rails on the rack.
3. Slide the inner rails into the outer rails, keeping the pressure even on both
sides. When the chassis has been pushed completely into the rack, it should
click into the locked position.
4. Optional screws may be used to secure the to hold the front of the chassis to
the rack.
1
1
1
2
1
3
Содержание SUPERSERVER 6027R-N3RF
Страница 1: ...SUPERSERVER 6027R N3RF 6027R WRF SUPER USER S MANUAL Revision 1 0a...
Страница 5: ...Notes Preface v...
Страница 10: ...Notes viii SUPERSERVER 6027R N3RF WRF USER S MANUAL...
Страница 25: ...Chapter 2 Server Installation 2 9 Figure 2 4 Accessing the Inside of the System...
Страница 30: ...SUPERSERVER 6027R N3RF WRF USER S MANUAL 3 4 Notes...
Страница 126: ...A 2 SUPERSERVER 6027R N3RF WRF USER S MANUAL Notes...