SuperServer 6019P-WT8 User's Manual
20
Note:
The figure above is for illustrative purposes only. Always install servers at the bottom
of the rack first.
Warning:
Stability hazard. The rack stabilizing mechanism must be in place, or the
rack must be bolted to the floor before you slide the unit out for servicing. Failure to
stabilize the rack can cause the rack to tip over.
Figure 2-1. Installing the Outer Rails
Installing the Chassis into the Rack
Installing the Chassis into the Rack
1. Align the chassis with the front of the rack rails.
2. Slide the chassis into the rack rails, keeping the pressure even on both sides. The
spring latch engages when the chassis is part way in. Push the server completely into
the rack.
3. (Optional) Insert and tighten the thumbscrews that hold the front of the server to the
rack.