2-1
Chapter 2: Rack Installation
Chapter 2
Rack Installation
This chapter provides instructions for mounting your chassis in a rack.
2-1 Preparing for Setup
The box in which your system was shipped should include two sets of rail
assemblies, two rail mounting brackets and the mounting screws to mount the
system into the rack. Please read this chapter in its entirety before beginning the
installation procedure.
Choosing a Setup Location
Decide on a suitable location for the rack unit that will hold your system. It should
be a clean, dust-free area that is well ventilated. Avoid areas where heat, electrical
noise and electromagnetic fields are generated. A nearby grounded power outlet.
is required
•
Leave at least 25 inches clearance in front of the rack to open the front door
completely.
•
Leave approximately 30 inches of clearance in the back of the rack to allow for
sufficient airflow and access for servicing.
•
It should be a restricted access location, such as a dedicated equipment room
or a service closet.
Содержание SUPERSERVER 1018R-WR
Страница 1: ...SUPERSERVER 1018R WR USER S MANUAL 1 0...
Страница 9: ...1 6 SUPERSERVER 1018R WR User s Manual Notes...
Страница 28: ...4 20 SUPERSERVER 1018R WR User s Manual Notes...
Страница 72: ...A 2 SUPERSERVER 1018R WR User s Manual Notes...