Superior SDDV-35 Скачать руководство пользователя страница 16

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

16

If the vent system extends more than 5 feet (1.5 
m) above the roof fl ashing, stabilizers may be 
necessary. Additional screws may be used at 
section joints for added stability. Guide wires 
may be attached to the joint for additional sup-
port on multiple joint confi gurations.

G.

 

Continue installation of horizontal/inclined 

sections -

 Continue with the installation of the 

straight vent sections in horizontal/inclined run 
as described in 

Step C.

 Install support straps 

every 5 ft. (1.52 m) along horizontal/inclined 
vent runs using conventional plumber’s tape. 

See Page 19, Figure 31. It is very important 
that the horizontal/inclined run be maintained 
in a straight (no dips) and recommended to be 
in a slightly elevated plane, in a direction away 
from the fi replace of

 

1/4 " rise per foot (20 mm 

per meter)

 which is ideal, though rise per foot 

run ratios that are smaller are acceptable all the 
way down to at or near level

.

  Use a carpenter’s 

level to measure from a constant surface and 
adjust the support straps as necessary. 

It is important to maintain the required clear-
ances to combustibles: 1" (25 mm) at all sides 
for all vertical runs; and 3" (76 mm) at the top, 
1" (25 mm) at sides, and 1" (25 mm) at the 
bottom for all horizontal/inclined runs.

H.

 

Frame roof opening -

 Identify location for 

vent at the roof. Cut and/or frame opening per 
Roof Framing Chart and 

Figure 23

.

One method of support is by utilizing fi eld pro-
vided support straps (conventional plumber's 
tape).  Secure the plumber's tape to the framing 
members with nails or screws.

 

Loop the tape 

around the vent, securing the ends of the tape 
to the framing. If desired, sheet metal screws #6 
x 1/2" length may be used to secure the support 
straps to the vent pipe.  Refer to 

Figure 21

F.

 

Change vent direction to horizontal/inclined 

run -

 At transition from or to a horizontal/in-

clined run, install the SV4.5E45 and SV4.5E90 
elbows in the same manner as the straight vent 
sections. The elbows feature a twist section to 
allow them to be routed about the center axis 
of their initial collar section to align with the 
required direction of the next vent run element. 

Twist elbow sections in a clockwise direction 
only so as to avoid the possiblity of unlocking 
any of the previously connected vent sections.

 

See 

Figure 22

.

K.

 Install the vertical termination - 

The fi nal 

step involves installation of the SV4.5CGV-1 
Vertical Termination.  Extend the vent sections 
to the height as shown in the "Vertical vent ter-
mination section" on 

Page 7

.  The SV4.5CGV-1 

Vertical Termination 

(Figure 25)

 can be installed  

in the exact same fashion as any other 

Secure 

Vent

 section. Align the termination over the 

end of the previously installed section, adjust-
ing the radial alignment until the four locking 
dimples of the termination are aligned with 
the inlets of the four incline channels of the 
last vent section.  Push the termination down 
until it fully engages, then twist the termination 
clockwise running the dimples down and along 
the incline channels until they are seated at the 
end of the channels.

I.

 

Install the roof fl ashing - 

Extend the vent 

sections through the roof structure. Install the 
roof fl ashing over the vent section and posi-
tion such that the vent column rises vertically 
(use carpenters level) 

(

Figure 24

 

)

. Nail along 

perimeter to secure fl ashing or adjust roofi ng 
to overlap the fl ashing edges at top and sides 
only and trim where necessary. Seal the top 
and both sides of the fl ashing with waterproof 
caulking.

J.

 

Install the storm collar -

 Install the storm 

collar, supplied with the fl ashing, over the 
vent/fl ashing joint. See 

Figure 24. 

Loosen the 

storm collar screw. Slide collar down until it 
meets the top of the fl ashing. Tighten the ad-
justing screw. Apply non-combustible caulking 
or mastic around the circumference of the joint 
to provide a water tight seal.

Figure 22

7-5/8”

(194 mm)

4-13/16 

(122 mm)

Swivel Joint

(360° swivel)

SV4.5E45

45° Elbow)

Swivel Joint

(360° swivel)

SV4.5E90

90° Elbow)

(206 mm)

8-1/8"

Figure 24

Storm
Collar

Figure 25

Framing Dimensions for Roof

Inches (millimeters)

Pitch

C

D

0/12

10-1/2 in.
(267 mm)

10-1/2 in.
(267 mm)

6/12

10-1/2 in.
(267 mm)

12 in.

(305 mm)

12/12

10-1/2 in.
(267 mm)

17-3/4 in.
(451 mm)

C

D

Figure 23

 - Roof Framing

Содержание SDDV-35

Страница 1: ...OUR SAFETY What to do if you smell gas DO NOT light any appliance DO NOT touch any electrical switches Do not use any phone in your building Immediately call your gas supplier from a neighbor s phone...

Страница 2: ...mponents are labeledforidentification DONOTuseanyother manufacturer s vent components with these appliances Use only the correct size venting 4 1 2 inner 7 1 2 outer These appliances comply with Natio...

Страница 3: ...eld converted Inlet Gas Supply Pressure all models Fuel Minimum Maximum Natural Gas 5 0 WC 1 24 kPa 10 5 WC 2 61 kPa Propane 11 0 WC 2 74 kPa 13 0 WC 3 23 kPa Table 4 Gas Pressure All Models Tables 4...

Страница 4: ...rizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS Inspection T...

Страница 5: ...n SeeMaintenanceinstructionsin Homeowner s Manual WARNING Carbon monoxide poisoning early signs of carbon monoxide poisoning are similar to the flu withheadaches dizzinessand or nausea If you have the...

Страница 6: ...thesearecommonlyusedforlocat ing television sets and decorative plants Be awarethatthisisaheatproducingappliance Objects placed above the unit are exposed to elevated temperatures To provide for the l...

Страница 7: ...2 1 2 64 mm or less See Figure 5 For projections exceeding 2 1 2 64 mm see Figure 6 For additional vent location restrictions refer to Figure 6 on Page 8 Figure 5 Side Elevation View Note See Figure...

Страница 8: ...15 feet above the meter regulator assembly 3 feet 91 cm within a height of 15 feet above the meter regulator assembly I Clearance to service regulator vent outlet 3 feet 91 cm 3 feet 91 cm J Clearanc...

Страница 9: ...inimum Distance to Unprotected Side Wall Top View of Fireplace 45 o At 14 minimum side wall clearance a combustible wall can project to any length Protected wall shown in white Inches millimeters Figu...

Страница 10: ...eld Wiring a MillivoltAppliances Theoperatingcontrol switch is factory installed b Electronic Appliances Connect 120 VAC electrical power to the appliance recep tacle Step 5 Page 25 Install blower kit...

Страница 11: ...8 1019 37 1 8 943 24 610 34 1 2 876 40 1 8 1019 27 1 2 698 26 1 2 675 13 3 4 337 G H Top View Co Axial Direct Vent Pipe Collars Top Rear Vent Flue Outlet 4 1 2 114 Combustion Air 7 1 2 190 275 FRAMING...

Страница 12: ...under 100 lbs if this is the only gas appliance in the dwelling Ref NPFA 58 there may be loss of pressure resulting in insufficient fuel delivery which can result in sooting severe delayed ignition o...

Страница 13: ...ve and discard the vent cover plate Reinstall and securely tighten all four cover plate screws Reinstall the lintel cover plate When the rear vent is being used from inside thefirebox removethetwoscre...

Страница 14: ...0 0 3 9 6 5 7 5 0 0 0 2 0 2 2 7 6 1 0 3 0 0 4 5 3 7 5 2 1 6 1 0 0 2 0 3 5 9 7 5 2 6 6 0 1 0 2 0 3 1 8 5 7 6 0 0 0 1 1 2 0 9 5 7 0 2 1 0 1 4 5 1 9 5 2 6 7 0 0 2 0 1 3 3 9 5 7 7 0 0 0 0 2 2 6 9 8 1 0 1...

Страница 15: ...lectinglengthcombinations Elbows areavailablein90 and45 configurations Refer to Figure 22 on Page 16 for the SV4 5E45 and SV4 5E90 elbow dimensional specifications Where required a telescopic vent sec...

Страница 16: ...t the center axis of their initial collar section to align with the required direction of the next vent run element Twist elbow sections in a clockwise direction only so as to avoid the possiblity of...

Страница 17: ...WhenusingSecureFlex useFirestop Spacer SF4 5VF Ceiling Firestop Spacer SV4 5VF Ceiling Firestop Spacer SV4 5VF Wall Firestop Spacer SV4 5HF When using Secure Flex use Firestop Spacer SF4 5VF When usin...

Страница 18: ...048 2 0 610 15 4 572 3 0 914 20 6 096 4 1 219 H H1 20 feet 6 096 m Max V V1 H H1 40 ft 12 192 m Max Table C H H1 Maximum HMaximum V Minimum feet meter feet meter feet meter 5 1 524 2 0 610 1 0 305 10...

Страница 19: ...ureVent useSV4 5VFfirestop spaceratceilingjoists whenusingSecureFlex use SF4 5VF firestop spacer If there is living spaceabovetheceilinglevel thefirestop spacer must be installed on the bottom side of...

Страница 20: ...ing of the Horizontal Square Termination SV4 5HT 2 SeeFigure13 onPage 11 for Min Distance to Base of Appliance For thicknesses greater than 10 see Table 12 I Continue installation of horizontal inclin...

Страница 21: ...ES H H 28 in 711 mm Maximum 7 in 178 mm When using Secure Flex use Firestop Spacer SF4 5HF Wall Firestop Spacer SV4 5HF H Wall Firestop Spacer SV4 5HF V When using Secure Flex use Firestop Spacer SF4...

Страница 22: ...Example If 20 feet of H H1 horizontal vent run is needed then 4 feet minimum of V vertical vent will be required This table shows a 1 V to 5 H ratio For every 1 foot of V vertical you are allowed 5 fe...

Страница 23: ...e 12 on Page 21 as an aid in venting component selection for a particular range of exte rior wall thicknesses Example If 20 feet total H H1 horizontal vent run is needed then 4 feet minimum of V verti...

Страница 24: ...inner flexible vent pipe 4 Slidetheinnerflexpipeovertheadaptercol lar Ensure the flexible vent pipe completely engages the adapter collar to a distance of 1 3 4 inches from the end and that it is free...

Страница 25: ...power must be connectedtoeitherofthesereceptaclesinorder to operate these blowers Install the blower kits according to the installation instructions provided with the kits 3 Wire the control within th...

Страница 26: ...BLACK BL BLUE R RED W WHITE G GREEN BK W BK BK BL R GROUND 24 V Transformer View A J Box Wiring when using unit mounted relay module BK W G C A V 0 2 1 Igniter Connector Leave the OFF ON switch which...

Страница 27: ...mpartment access door Removing Control Compartment Door Openthedoorby gentlyliftingitupwarduntilthe hook catches on boths sides clear the locating slots Then pull door out to remove D Turn on burner t...

Страница 28: ...ogs have locating notches which cor respond to locating brackets and holes which correspond to locating pins to help ensure that they are properly positioned Proper log placement is critical to preven...

Страница 29: ...g Installation Instructions refer to Figure 52 Carefully position the ceramic fiber logs into the firebox as shown here Logs should be placed in the order shown and per the following instructions 1 Se...

Страница 30: ...G The glass door of this appli ance must only be replaced as a complete unit as provided by themanufacturer Donotattempt to replace broken cracked or chipped glass separately WARNING Do not attempt to...

Страница 31: ...Cold Climate Insulation and Page 9 for Clearances Burner Air Shutter Adjustment Procedure CAUTION Theairshutterdoorandnearbyappliancesurfacesare hot Exercise caution to avoid injury while adjusting f...

Страница 32: ...77L76 SV4 5E45 45 Degree Elbow 5 77L77 SV4 5E90 90 Degree Elbow 3 4 5 6 7 10 1 8 9 11 INSTALLATION ACCESSORIES The following flashings come packaged with a storm collar 6 77L78 SV4 5F Flat Roof Flashi...

Страница 33: ...12 pack 23 91L66 SF GC4 6 Gear Clamp 4 5 in 114 mm for flex 6 pieces 23 91L67 SF GC7 6 Gear Clamp 7 5 in 190 5 mm for flex 6 pieces 24 99L02 SV4 5HRK14 Horizontal Riser Kit 14 24 99L03 SV4 5HRK36 Hor...

Страница 34: ...ed exactly a fire explosion or produc tion of carbon monoxide may result causing property damage personal injury or loss of life The installation is not proper and complete until the operation of the...

Страница 35: ...rtoFigure59 andremovethepilot hood assembly to access the hexed pilot orifice Remove and replace the orifice with the one provided with the kit Pilot for SIT Millivolt Gas Valve Figure 59 Pilot Orific...

Страница 36: ...move the orifice from the manifold and replace it with the one provided in the kit See Table 14 for orifice sizes fornaturalandpropanemodels Figure 61 illustrates the orifice b Retrievetheburnerandhol...

Отзывы: