background image

06/14 LT013 

Premier VS Infrared Heating System 

Installation, Operation and Maintenance Instructions 

  

FOR YOUR SAFETY 

 

  CONSIGNES DE SEURITE 

If you smell gas: 

 

1. Open windows 
2. Don’t touch electrical switches 
3. Extinguish any open flame 
4. Immediately call your gas supplier

 

Si vous sentez une odeur de gaz: 
1. Ouvrez les fenêtres 
2. Ne touchez pas aux interrupteurs 

électriques 

3. Éteignez toute flamme nue 
4. Contactez immédiatement votre 

fournisseur de gaz 

Installer 

Read and thoroughly understand these instructions before attempting any installation. 

Owner 

Retain this manual for reference. 

 

WARNING 

Improper installation, adjustment, alteration, service or maintenance can cause injury, death or 

property damage. Read the installation, operating and maintenance instructions thoroughly before 

installing or servicing this equipment.

 

AVERTISSEMENT 

Une installation, un réglage, une modification, une réparation ou un entretien incorrect peut entraîner 

des dommages matériels, des blessures ou la mort.  Lisez attentivement les instructions d’installation, 

de fonctionnement et d’entretien avant de procéder à l’installation ou à l’entretien de cet équipement.

 

 
 

 

 

 

 

 

563 Barton Street, Stoney Creek, Ontario L8E 5S1 

www.superiorradiant.com

FOR YOUR SAFETY 

 

  CONSIGNES DE SEURITE 

Do not store or use gasoline or other 
flammable vapors and liquids in the 
vicinity of this or any other appliance.

 

Il est interdit d’utiliser des liquides 
inflammables ou dégageant des vapeurs 
inflammables, a proximités de tout 
appareil fonctionnent au gaz. 

 

 

!

 

!

 

 

!

 

!

!

 

 

!

Содержание Premier VS

Страница 1: ...ntenance can cause injury death or property damage Read the installation operating and maintenance instructions thoroughly before installing or servicing this equipment AVERTISSEMENT Une installation...

Страница 2: ...or explosion hazard CAUTION FIRE OR EXPLOSION This heater is equipped with an automatic ignition device Do not attempt to light the burner by hand Failure to comply could result in a serious fire and...

Страница 3: ...es 23 B Tailpipe Tubes 28 C Burners 29 D Reflectors 33 E Optional Shield Equipment 37 F Deco Grille Option 41 Part 2 Vacuum Pump Venting 43 A Vacuum Pump Mounting 44 B Ventilation Connections 48 C Add...

Страница 4: ...s are specially engineered built for the individual Positions they are installed in along each Branch Burner Rate BTU hr is determined by the Vacuum Setting of the Branch Rates can be adjusted by chan...

Страница 5: ...Repair Garages NFPA 88B in the US and CAN CGA B149 1 B149 2 in Canada Parking Structures Technical requirements are outlined in the Standard for Parking Structures ANSI NFPA 88a in the US and CAN CGA...

Страница 6: ...t L i n e Burner 1 Combustion Tube Burner 1 Coupling R a d i a n t B r a n c h A Burner 2 R a d i a n t L i n e R a d i a n t B r a n c h B Burner 2 Reducer Flexible Boot T a i l p i p e D a m p e r...

Страница 7: ...i a n t B r a n c h B R a d i a n t L i n e R a d i a n t B r a n c h A Coupling Burner 1 T a i l p i p e T a i l p i p e D a m p e r C o u p l i n g s Burner 2 R a d i a n t L i n e Combustion Tube...

Страница 8: ...0 2cm Vacuum Switch Reducer w Vacuum Switch 4 10 2cm Or 6 15 2cm Tubes 4 10 2cm 5 12 7cm Tube U Bend 4 10 2cm 16 40 6 cm 16 40 6 cm 20 50 8 cm 12 30 5 cm 16 40 6 cm 6 15 2 cm 12 30 5 cm 12 30 5 cm 7 4...

Страница 9: ...61 cm 16 40 6 cm 17 43 cm Tube Elbow 5 12 7cm 4 10 2cm 17 43 cm 4 10 2cm 16 40 6 cm 28 71 cm Side Reflector 15 5 39 4 cm 25 63 5 cm 17 43 cm 5 12 7cm 5 12 7cm 17 43 cm 29 74 cm 10 25 4 cm Bottom Shie...

Страница 10: ...120 VAC 60 Hz 0 2 Amp 36 0 9 m cord connecter with grounded 3 prong plug Flue and Outside Air Connection 4 type C duct for flue adaptor and outside air optional provided at the heater Natural Gas Min...

Страница 11: ...bel CL034 Burner Rating Plate VL007 Warning Diagram UL007 O P E N I N S I D E o f P A N E L Manufacturer s Logo SRP Wiring Diagram VL008 Venting Label VL005 Clearance Label VL002 Burner Rate Chart VL0...

Страница 12: ...llation Operating and Maintenance Instructions thoroughly before installing or servicing this equipment AVERTISSEMENT For use with natural gas or propane A conversion kit as supplied by the manufactur...

Страница 13: ...orifice LP Gas requires No K drill size orifice A conversion kit as supplied by the manufacturer shall be used to covert to the alternate fuel A flow plate appropriate to the position of the burner i...

Страница 14: ...UH See Manual for Complete Details NOTES 29 26 23 21 B 34 32 C FIG 1 B FIG 4 A D D C C FIG 2 B 21 74 D A 23 79 FIG 3 C B 26 82 A 29 86 FIG 4 C D B 32 89 34 92 for space heating applications inches MIN...

Страница 15: ...60Hz 1A MODEL NO No modele ELECTRICAL RATING Class electrique LIGHTING INSTRUCTIONS I I SHUT DOWN INSTRUCTIONS E S D T C E R U S Patent 5 842 854 G N F I D E Press d alimentation MIN SUPPLY PRESSURE R...

Страница 16: ...AC 60Hz 1 PH 0 75 HP Tube Connection 6 dia Inlet 4 dia Outlet Figure 7 Vacuum Pump A Available in RH or LH Style 7 73 7 13 18 1 8 38 21 3 4 25 10 8 4 0 10 2 8 78 19 6 22 3 8 12 20 6 Dimensions Inches...

Страница 17: ...VAC 60Hz 3 PH 1 5 HP Tube Connection 6 dia Inlet 6 dia Outlet Figure 8 Vacuum Pump B Available in RH or LH Style 10 01 25 4 9 03 22 9 8 24 20 9 11 02 28 0 6 0 15 2 2 97 7 5 8 79 22 3 Dimensions Inches...

Страница 18: ...d fire retardant treated or plastered The stated clearance to combustibles represents a surface temperature of 90 F 50 C above room temperature Building materials with low heat tolerance such as plast...

Страница 19: ...8 199 206 211 59 64 67 72 75 77 150 163 170 183 191 196 4 4 6 6 6 6 10 2 10 2 15 3 15 3 15 3 15 3 4 4 6 6 6 6 10 2 10 2 15 3 15 3 15 3 15 3 73 77 80 84 87 89 186 196 204 214 221 226 49 52 54 56 58 60...

Страница 20: ...in the Equipment Specifications section If possible lay the entire system out on the floor prior to installation This will help identify any potential problems with the installation as well as any di...

Страница 21: ...in Radiant Branch Total Output for Branch MBTU hr Minimum Tailpipe for Branch ft m minimum tailpipe length must be increased by 50 3 2 3 2 Burner Input Rate at each Position MBTU hr OR 3 If result is...

Страница 22: ...ncrements of Tube and Reflector can be used until one reaches the Common Tailpipe areas or Vacuum Pump connections The general order of material in this manual is recommended for low hassle installati...

Страница 23: ...tallation NOTE The Premier VS System does not typically require the use of Baffles if Baffles are desired please consult with the Manufacturer SRP prior to installation A Radiant Line Tubes 1 Locate h...

Страница 24: ...aps with screws Reflector End Cap Tight Screws Loose Screws Reflector overlap approx 4 Secure every second reflector overlap with 8 3 8 screws Burner 2 Coupling Install the J bolts in the hangers imme...

Страница 25: ...1 below Figure 11 End Vent Cap Orientation Concrete Beam Beam Clamp Turnbuckle 24 Min 3 8 Threaded Rod I Beam I Beam Anchor 12 Min S Hook Note Close all S Hooks Turnbuckles J Bolts 12 Min Truss Eye Bo...

Страница 26: ...ustion Tubes have the Burner mounting hole positioned at 12 o clock and facing downstream Refer to Figure 17 4 Join consecutive pieces of Tube using Couplings Insert one end of both Tubes fully into t...

Страница 27: ...ready for Burner installation s Figure 14 View of System after Installation of Radiant Line Tubes Combustion Tube VT001 Radiant Tube CT001 or CT002 Reflector Hanger CR003 Combustion Tube VT001 Turnbuc...

Страница 28: ...ch Branch Symmetric Identical Branches require the same Vacuum setting so One Damper coupling is located before the Tailpipe splits into separate Branches Non Symmetric Branches require a separate Dam...

Страница 29: ...furthest end of the branch from the Vacuum Pump and the Burner number increases as the branch runs towards the Vacuum Pump As shown in Figure 16 referred to in your System Design Layout Each Burner is...

Страница 30: ...nger after a Burner mounting hole location This prevents the Tube from twisting rotating once the Burner is installed Refer to Figure 9 and Figure 17 2 J bolts must be installed before the Reflectors...

Страница 31: ...hold it in place on the underside of the Burner Casting during installation 2 Align Fasten Burner to Combustion Tube with U Bolts DO NOT over tighten the nuts on the U bolts this damages the Combustio...

Страница 32: ...ts Burner 1 Burner 2 Secure Burner With U bolts Install J bolts only in the Hanger immediately following a Burner Ensure there is a Hanger a Max of 8 from the Front of each Burner J bolt J bolt T o T...

Страница 33: ...in the Reflector run allows unimpeded installation and servicing of the Burner 4 Install Reflector Brackets Place one at each Reflector overlap position and one in the middle of each 10 ft 3 m Reflect...

Страница 34: ...f first Reflector Reflector CR001 CR032 Reflector End Cap CR002 Reflector Bracket Clip Sets CR024 Spring Clip Secure support with 8 x 3 8 screws and tighten firmly where required Reflector Bracket Det...

Страница 35: ...8 x 3 8 screws on the open end of the Reflector which will be under the Burner at the end of the Reflector run Burner Reflectors are for use instead of End Caps If Burner Reflectors for Continues Refl...

Страница 36: ...all Reflectors O V E R U N D E R O V E R Overlap Reflectors as shown Tight Screws Reflectors CR001 CR032 overlap approx 4 Loose Screws Tighten Reflector Bracket screws 8 3 8 x 1 1 4 on every second R...

Страница 37: ...r Reflectors are installed after the Burner installation and before during assembly of the main Reflector run All pieces are connected using 8 x 3 8 Screws The Side pieces and End Sections are install...

Страница 38: ...screws through one Side Segment into one End Cap Position under Burner Attach second End Cap to first Side Segment Attach second Side Segment to both End Caps Base of Burner Reflector is now assemble...

Страница 39: ...main Reflector tightly with 8 x 3 8 screws spaced about 18 0 5 m apart Install three 3 Side Reflector Brackets per Side Reflector spaced about 48 1 2 m apart using 8 x 3 8 screws DO NOT tighten screws...

Страница 40: ...igure 27 Side Reflector Installation Detail Reflector Hanger 8 x 3 8 Screw 8 x 3 8 Screw Reflector 8 x 3 8 Screws Notch the Side Reflector for Reflector Brackets and Hangers Reflector Screws to be ins...

Страница 41: ...m is above the ceiling structure Refer to Figure 28 and Figure 29 below for their respective details Figure 28 Deco Grille Mounted Directly To Heater Notch Deco Grille Support for Hangers Supports Ref...

Страница 42: ...rt 1 Figure 29 Deco Grille Mounted With T Bar 2 Min Reflector Hanger T bar T bar Suspended Ceiling Notch Side Shield as required for Reflector Brackets and Hangers CR027 T bar Shield CR059 Side Shield...

Страница 43: ...der placing the Pump somewhat off past the centerline of the connecting Tailpipe so that as the system grows the Flexible Boot Connection in fact improves performance Safety Warnings Confirm that the...

Страница 44: ...ly 3 Install using the Vacuum Pump Mounting Kit if purchased Chain threaded rods for ceiling mounting are NOT included in package 4 Ensure elevation of Inlet will allow for the alignment of the Tubing...

Страница 45: ...mp Suspension Isolators Mount bracket to wall with suitable fasteners VH010 Mounting Kit When suspending from ceiling add threaded rod to prevent horizontal movement of pump Turnbuckles for height adj...

Страница 46: ...gravity opening to a building Discharge must be at least a specified distance from any opening through which vent gases can enter a building Venting must terminate beyond any combustible overhead and...

Страница 47: ...per Vacuum Pump Outlet Sealant RTV Silicone Fasteners Minimum of Two 2 sheet metal screws 8 x 3 4 per joint For specific Part Numbers of Wall Vent connection pieces see Figure 33 OR the listing in th...

Страница 48: ...two Use the Silicone Connector Boot to connect the Vent Pipe to the Vacuum Pump Outlet Refer to Figure 33 or Figure 34 respectively for mounting type details Fasten To Ceiling Bolts Approved Thimble...

Страница 49: ...sing high temperature Silicone Sealant RTV Silicone 4 Where condensing designs are specified a Condensate Drain may be installed as shown in Figure 36 Ensure connection to Drain Pipe is flexible to al...

Страница 50: ...cked with the Vacuum Pump details can be found in Electrical Connections A Combustion Air Supply Duct Connections 1 Install Blower if required 2 Install Combustion Air Supply ductwork and Damper Coupl...

Страница 51: ...ompleted Burners must be isolated from any pressure testing in excess of psi 3 5 kPa Failure to comply may expose the Burner components to damaging high pressure requiring replacement of key component...

Страница 52: ...s Figure 39 Connector Installation Details 3 7 62 cm Max Displacement 12 30 cm Heater Movement Vertical As Shown Below Alternate Positions Okay END VIEW Air Flow Direction CORRECT POSITIONS INCORRECT...

Страница 53: ...mostat for better control of heat levels and fuel usage Thermostats must be located mounted within the operting heat envelope of the Radiant Line Branch being controlled Thermostats must be protected...

Страница 54: ...panel door on the Burner Cover Burners are connected via a standard three prong plug grounded which has a Power Cord length of 3 ft 90 cm and extends from the back of the Burner Any repair replacement...

Страница 55: ...e Vacuum Pump 1 Mount the Vacuum Switch and make the connections to the Blower as required See Figure 42 below for details Ensure that field wiring maintains the required clearances when being routed...

Страница 56: ...Air Blower Connection Diagram Part VE007 Vacuum Switch SPDT C R Y G W 1 5 4 2 COIL Black Black COIL 3 6 115V 60 HZ 15 A Supply Voltage 115 VAC 1 3 HP 1 PH Fresh Air Blower White Red Transformer Relay...

Страница 57: ...l Panel according to the device OEM Manual as required for the Heating Zone system Plan Layout 6 Mount position the Vacuum Switch onto the Radiant System as shown in Figure 35 Connect the Vacuum Switc...

Страница 58: ...CE046 Transformer Red Red White Neutral VS Burners White 1 PH Vacuum Pump Motor OR 3PH Motor Starter Hot Supply Voltage 120 V 60 HZ White Black Thermostat 6 3 COIL Black Black COIL 2 4 5 1 t W G Y R C...

Страница 59: ...DT TRANSFORMER DPDT RELAY P N CE047 TRANSFORMER THERMOSTAT ZONE 2 t 120V 60 HZ SUPPLY VOLTAGE 1 PH VACUUM PUMP MOTOR OR 3PH MOTOR STARTER AIR SWITCH PURPLE ZONE 2 VS BURNERS NEUTRAL VS BURNERS ZONE 1...

Страница 60: ...Burners Zone 2 To 24V Relays in VS Burners Zone 3 To 24V Relays in VS Burners Zone 4 24 Volt AC SE010 24 Volt 100VA Transformer Mounted Externally 115V 60 Hz Grounded Supply VE007 N O Vacuum Proving S...

Страница 61: ...rs Zone 1 To 24V Relays in VS Burners Zone 2 To 24V Relays in VS Burners Zone 3 24 Volt AC 115V 60 Hz Grounded Supply VE007 N O Vacuum Proving Switch At The Pump To DI1 CM Of VFD VE093 Relay Boards CO...

Страница 62: ...urners Zone 2 To 24V Relays in VS Burners Zone 3 24 Volt AC 115V 60 Hz Grounded Supply VE007 N O Vacuum Proving Switch At The Pump To DI1 DI2 CM Of VFD VE093 Relay Boards CONTROL PANEL CM DI1 T3 T2 T1...

Страница 63: ...pe section of the system and used in the 10 ft 3 m following all Burners with a rating of 150 000 BTU HR or higher Ensure that Tubes are fully inserted in the Couplings and tightened with band clamp h...

Страница 64: ...k up gas pressure is not above 14 in W C 3 Set all thermostats below room temperature and turn ON main power no part of the System should be energized 4 Check each Radiant Branch in each Zone in seque...

Страница 65: ...ted 6 Shut down the System 7 Turn ON the Gas Supply 8 Turn up the Thermostat s to start the System and let it run with Burners operating for at least 30 minutes 9 With a manometer check the vacuum at...

Страница 66: ...cap 12 0 25 O D R idgid Tubing H Inches W C Figure 48 Manometer Placement Diagram Radiant Branch End Vent Vacuum Inches W C Burner Position Flow Plate No 1 Rate MBTU hr Burner Position Flow Plate No...

Страница 67: ...e is established the flame sensor signal returns to the control module and the ignition spark ceases 6 If the flame is not established the control module will re try the ignition cycle again in 30 sec...

Страница 68: ...s Set spark gap at 0 125 3 175 mm and clean the electrodes 3 Verify that flame observation glass is clean free of cracks and airtight 4 Inspect air filter Change as necessary 5 Observe each flame thro...

Страница 69: ...as required to avoid obstructions 2 Check that Flexible Boot Connectors are without cracks kinks or leaking connections 3 Ensure that the Vacuum Pump and motor mounting bolts are tight 4 Make a visual...

Страница 70: ...ividual Burner control Burners No Power to Burner 1 Check if correct Thermostat is calling for heat 2 Check for 120VAC supply at Burner No Gas Supply 1 Ensure manual supply valve to the System is turn...

Страница 71: ...ADAPTOR AND GASKET AIR 6 VH001 COMBUSTION AIR FILTER 7 CH007 VALVE TRAIN GASKET BURNER MOUNT 8 VG016 BURNER HEAD ASSEMBLY ELECTRODE INCLUDED 9 CE008 TRANSFORMER 10 CE056 CONTROL MODULE FENWAL 11 CE010...

Страница 72: ...No Description CG022 GAS FLEX CONNECTOR 36 x 1 2 dia CG024 GAS FLEX CONNECTOR 36 x 3 4 dia CG011 SHUT OFF VALVE for gas flex 1 2 CG028 SHUT OFF VALVE for gas flex 3 4 Part No Description CT011 VENT TE...

Страница 73: ...T VT003 S S COMBUSTION TUBE VS CT030 S S RADIANT TUBE CR019 SIDE REFLECTOR CR005 S S COUPLING ASS Y 4 CR016 BRACKET ASS Y for SIDE SHIELD CR027 S S COUPLING LINER CR035 RETAINER CLIP SIDE SHIELD CR047...

Страница 74: ...r a period of 12 months from date of purchase In no event shall the manufacturer be liable for incidental expense or consequential damages of any kind This warranty does not cover any shipping install...

Отзывы: