Figure 35: Ceiling Mounting - Recommended Venting (Vertical)
Additional Pump Connections and Equipment
1.
Connect the Reducer to the end of the Common Tailpipe using a 4” Butt Joint Clamp. Ensure a minimum of
2" (5 cm) clearance between the Reducer and the Pump Inlet.
2.
Install the Flexible Boot Connector between the Reducer and Pump Inlet, to reduce vibration and noise
transmission, using a gear clamp at either end, as shown in Figure 36.
Figure 36: Tailpipe to Vacuum Pump Connections
3.
Seal all joints and seams using high temperature Silicone Sealant (RTV Silicone).
Содержание Premier VS-VH
Страница 8: ...Series Premier VS VH Page 8 LT135 Dec 2019 Figure 2 Non Symmetric System Overview...
Страница 9: ...Series Premier VS VH Page 9 LT135 Dec 2019 Basic Components Figure 3 Common Component Dimensions...
Страница 12: ...Series Premier VS VH Page 12 LT135 Dec 2019 Figure 6 Locations of Burner Labels Stickers...
Страница 27: ...Series Premier VS VH Page 27 LT135 Dec 2019 Figure 17 Air Plate Change Out Procedure...
Страница 33: ...Series Premier VS VH Page 33 LT135 Dec 2019 Figure 26 Burner Reflector Installation Sequence Details...