ECCO SG04LP1 | User Manual
58
Dump Load or Diversion Load is an important part of an off-grid power system. When the battery ( Battery
Bank ) is fully charged, and the water turbine / wind turbine / solar PV module is still generating, a dump load
is a useful device to send spare electricity to. This can be done by using a switch on a smart load option or by
utilising a wind turbine controller with a built-in dump load. Also, a hot water tank controlled via a smart-load
can act as a good ‘dump-load’ however, in very windy conditions it may be necessary to shunt the output.
Most wind turbines are three-phase PM type. Therefore, either a wind turbine controller or a direct connec
-
tion to the MPPT via a simple protection circuit will be required.
5.21. Advanced Settings for Auxiliary Load
To configure Auxiliary Load (previously known as “smart load”) settings, click on the AUX LOAD icon.
What this page displays:
Use of the Gen (Aux) input or output.
What you can do from this page:
Set up a generator input.
Set up an auxiliary (smart) load.
Set up Peak Power Shaving.
Use an additional inverter or micro inverter.
A nice feature of this page is that when the batteries are full and the inverter is still producing power from
the solar PV or turbine, it is possible to direct the power generated to another load such as a water heater.
Содержание ECCO SUN-3.6K-SG05LP1-EU
Страница 4: ...ECCO SG04LP1 User Manual 4 APPENDIX A 68 APPENDIX B 69 APPENDIX C 69 APPENDIX D 69 APPENDIX E 70 ...
Страница 9: ...ECCO SG04LP1 User Manual 9 2 1 Product Size ...
Страница 17: ...ECCO SG04LP1 User Manual 17 4 5 Function Port Definition ...
Страница 21: ...ECCO SG04LP1 User Manual 21 ...
Страница 23: ...ECCO SG04LP1 User Manual 23 4 9 1 Recommended AC Surge Protector ...
Страница 26: ...ECCO SG04LP1 User Manual 26 4 12 Meter Connection 4 12 1 System Connection for the CHNT Meter ...
Страница 27: ...ECCO SG04LP1 User Manual 27 4 13 Wiring System for Inverter ...
Страница 30: ...ECCO SG04LP1 User Manual 30 4 16 Single Phase Parallel Connection Diagram 03 02 01 ...
Страница 31: ...ECCO SG04LP1 User Manual 31 4 17 Three Phase Parallel Inverter 03 02 01 ...
Страница 32: ...ECCO SG04LP1 User Manual 32 4 18 Typical Application Diagram of Diesel Generator ...
Страница 63: ...ECCO SG04LP1 User Manual 63 6 OPERATING MODES 6 1 Mode I Basic 6 2 Mode II With Generator ...
Страница 64: ...ECCO SG04LP1 User Manual 64 6 3 Mode III With Smart Load 6 4 Mode IV AC Couple ...
Страница 65: ...ECCO SG04LP1 User Manual 65 ...
Страница 71: ...Ltd wered by Po ...