![SunStar SPS/E-BH-6100 Series Скачать руководство пользователя страница 18](http://html.mh-extra.com/html/sunstar/sps-e-bh-6100-series/sps-e-bh-6100-series_user-manual_1400351018.webp)
18
[ Fig. 9 ]
6) Connecting cables to control box
A. As in the figure, erect the machine upright to the
maximum and make sure to insert the indexing
plunger(A) into the bed hole.
[ CAUTION ]
When erecting the machine, please check that the
indexing plunger is inserted into the bed hole.
B. Install the grounding line which is linked to the sewing
machine and the control box.
[ Fig. 10 ]
C. When the cables are fully connected between the
machine and the control box, fix them below the table as
in the figure. (estimate the length of cables based on the
consideration that the machine should be lifted for fixing
the cables)
[ Fig. 11 ]
Control box
Grounding line
Bed hole
A
Содержание SPS/E-BH-6100 Series
Страница 43: ...43 8 8 Table Drawings 1 Basic ...
Страница 44: ...44 9 9 Air System Circuit Diagram ...
Страница 45: ...45 ...
Страница 46: ...46 ...