Form 43343320
Aug 2012
-11-
7.0)
TYPICAL LAYOUTS – SPS/SPU SERIES
Burner Box
Flue Termination
10 FT. Body Section
30 FT.
SYSTEM
40 FT.
SYSTEM
20 FT.
SYSTEM
50 FT.
SYSTEM
60 FT.
SYSTEM
70 FT.
SYSTEM
10FT.
SYSTEM
5 FT. Body Section
90 Deg. Elbow
180 Deg. U-Bend
LEGEND
MODEL
MODEL
MODEL
MODEL
EMITTER LENGTH
EMITTER LENGTH
EMITTER LENGTH
EMITTER LENGTH
MODEL
MODEL
MODEL
MODEL
BODY LENGTH
BODY LENGTH
BODY LENGTH
BODY LENGTH
Min.
Min.
Min.
Min.
Max.
Max.
Max.
Max.
Min.
Min.
Min.
Min.
Max.
Max.
Max.
Max.
SPS 40
10 Ft.
20 Ft.
SPU 40
10 Ft.
10 Ft.
SPS 50
20 Ft
40 Ft.
SPU 50
10 Ft.
20 Ft.
SPS 75
20 Ft.
40 Ft.
SPU 75
10 Ft.
20 Ft
SPS 100
30 Ft.
50 Ft.
SPU 100
15 Ft.
25 Ft.
SPS 125
30 Ft
60 Ft.
SPU 125
15 Ft.
30 Ft.
SPS 150
40 Ft.
60 Ft.
SPU 150
20 Ft.
30 Ft.
SPS 175
50 Ft.
70 Ft.
SPU 175
25 Ft.
35 Ft.
SPS 200
50 Ft.
70 Ft.
SPU 200
25 Ft.
35 Ft.
NOTES:
NOTES:
NOTES:
NOTES:
1.
In all configurations, the control unit must be connected directly to either a) the 24-hole flange of the 10 ft.
aluminized steel starting body section (for 10 ft., 20 ft., and 30 ft. systems) or b) the 6-hole flange of the 10
ft. alumi-therm steel starting body section (for 40 ft., 50 ft., 60 ft., and 70 ft. systems).
2.
Joining of two 90º elbows directly together to form a “Z” shape IS NOT permitted.
3.
SPS / U 175 - 40 ft length available for special applications.
4.
5 Ft. Body Packages may be utilized on any of these heaters to yield heater lengths from 15 ft. to 70 ft.
5.
Any configuration of components not shown in the illustrations may be used except as noted in 1 and 2
above.