8

Mounting   

● 

Each module must be securely fastened at a minimum of 8 points(7mm×11.5mm). The frame has been stress 

tested for mounting on the long sides. Its short sides must not secure the module.   

● 

We recommend using a torque wrench for installation. The tightening torque(using stainless steel M6 bolts 

Stainless steel washer and Stainless steel M6 nut ) should be around 15-20Nm.Use the existing holes to secure 

the module and do not drill additional holes(doing so would void the warranty).Use appropriate 

corrosion-proof fastening material.   

● 

Clearance between the module frame and mounting surface may be required to prevent the junction box from 

touching the surface, and to circulate cooling air around the back of the module. If the modules are to be 

installed on the roof or wall of a building, the standoff method or the rack method is recommended. 

Stand-off 

method

: The modules are supported parallel to the surface of the building wall or roof. Clearance between the 

module frames and surface of the wall or roof is required to prevent wiring damage and to allow air to 

circulate behind the module. The recommended stand-off height is 115mm. If other mounting means are 

employed, this may affect the Listing For Fire Class Ratings. 

                                     

1

3

2

 

Example for mounting the PV modules to the substructure:                                           

1、

  Stainless steel M8 nut 

                                                                                                                                                 

2、 

Stainless steel 

washer 

                                                                                                                           

3、  

Stainless steel M8 t-head bolt 

● 

Installation of the rooftop

 

When  doing  installation  on  roof  and  building,  make  sure  that  the  modules  are  fastened.  This  will  prevent  them 

from falling down in extreme weather. 

Do comply the safety regulations and use appointed secure equipment. 

Make  sure  there  is  enough ventilation  at  the  back  of  solar  modules  to  help  ease  the  installation  and  prevent  the 

hydrometeor 

Make sure there is enough area between the installation planes and the back of the modules; minimum distance: 

50mm       

9

Wiring   

● 

The modules use the

PV-RH701

 type junction box. This box, on the back side of the module, is weatherproof 

and is designed to be used with standard wiring or conduit connections. Wiring methods should be in 

accordance with the NEC (National Electrical Code). Bypass diodes and cable clamps are included with each 

Содержание SR220-250P SERIES

Страница 1: ...ules mainly include220W 225W 230W 235W 240W 245W 250W 1 Electrical Specification POLY Si series PHOTOVOLTAIC MODULE Model SR220 250P Number of cells pcs 60 Pmpp W 230 3 Voc V 38 0 3 Isc A 8 18 3 Vmpp...

Страница 2: ...ight 50mm 1 97inch 2 Weight 21 5Kg 3 Cell 60 pcs 156mm 156mm solar cells 6 lines10 rows connected in series and array in matrix 4 Output cable 4mm2 cable with TUV certification with polarity mark wate...

Страница 3: ...CLIMATE CONDITION Install the PV module in the following conditions Environment temperature 47 2 Operating temperature 40 to 85 Waterproof don t dip the modules into the water or continually explode...

Страница 4: ...aximum load site specific live loads such as wind and snow should be taken into account The installation of project must be facing north in the southern hemisphere and facing south in the northern hem...

Страница 5: ...diode to decrease the loss of energy the shadow will lead to the loss of output power 6 Grounding All module frames must be attached to an earth ground A qualified electrician must do the ground conn...

Страница 6: ...t through the hole fixed in the aluminum frame 3 Use the nut and cut washer to fix all the parts The copper wire can not be attached to the aluminum Do not interrupt or influence the conductive connec...

Страница 7: ...urface of the wall or roof is required to prevent wiring damage and to allow air to circulate behind the module The recommended stand off height is 115mm If other mounting means are employed this may...

Страница 8: ...ed through the shaded area by the other modules When a bypass diode is wired in parallel with the series string the forced current will flow through the diode and bypass the shaded module thereby mini...

Страница 9: ...ped or rubbed away when dry as this will cause micro scratch We recommend that the system be inspected at regular intervals 13 Checklists All fastenings are tight and secure and free of corrosion All...

Страница 10: ...k on the rear of the module using sharp objects Exercise utmost caution when working on wiring and the inverter Be sure carefully to follow manufacture s installation instructions Artificially concent...

Отзывы: